My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG19910506
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
1991
>
AG19910506
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2003 9:14:47 AM
Creation date
11/27/2017 12:03:24 PM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
5/6/1991
Board
Board of Commissioners
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
129
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST ESTIMATE <br />-~ Coddle Creek Dam and N.C.Highw~v 73 Relocation <br />~:~ Cabarrus County, North Carolina <br />il LA~ Proposal. ~o. 013~1C <br />~ I. Services of an ~gineering Technician <br /> <br /> Regula~ t/me 3~0 hours at $23.50/hou~ ........................... <br /> I Overt/~e 920 hours at $23.50/hour x 1o3 .......................... S 28.106 <br /> Transportation, no charge for full time work (~0+ hours/week) .... S 0 <br /> <br /> Total Section ! ...... <br /> I TI. Services of a Supple~antal Engineering Technician <br /> Based on 36 weeks of 26 hours per week. <br /> i. ~ Re~lar ti.e. 936 hours at S~3.~O/hour ........................... <br /> Transportation, 180 trips of 60 miles/round trip at $Oo30/mile.o.$ ~,2~0 <br /> <br /> ~j Total Section TT ..... S <br /> ! <br /> 1TI. Laboratory Testing and On-site Trailer Rental <br /> <br /> A. ~stimate 15 standard Proctors at S95/each ..................... $ 1,425 <br /> i B. Compressive strength of concrete cylinders, based on 200 sets <br /> of 3 cylinders/set, 600 cylinders at $7.50/cylinder ........... $ 4,500 <br /> C. On site office furnishing phone, fax and equipment outlined in <br /> RFP (based on use of on site house basement with water, sewer, <br /> I heat/electricity furnished by othe~s) 22 months at $~00/month.$ 6,600 <br /> <br /> Total Section III .... $ 12,325 <br /> IV. Engineering Services <br /> I A. Services of a principal technician as pro~ect manager, <br /> estimate 4 hours/week for 92 weeks, 368 hours st $55/hour ..... $ 20,2~0 <br /> B. Services of a geologist on-site to assist with documentation <br /> I of foundation EroutinK and cutoff trench excavations, estimate <br /> 25 hours/week for 12 weeks, 300 hours at $55/hour ............. $ 16,300 <br /> C. Services of Sr. Geotechnicsl Engineer, 30 hours at $75/hour...$ 2,230 <br /> D. Transportation, estimate 3.000 miles at $0.30/mile ............ $ 900 <br /> I E. Clerical/Drafting, est. 3/4-hour/week x 92 weeks at S23.50 .... $ 1,622 <br /> Total Section IV ..... $ ~1,512 <br /> <br /> I Total Sections I, II, III and IV ..... $193,859 <br /> Total Estimate ..... $200,000 <br /> <br /> I This cost estimate is based on the prelected construction schedule prepared by <br /> Rlythe Industries and provided by HDR, Inc. This schedule indicates that the <br /> portion of work we expect to monitor (first work to be excavation of the core <br /> - Phase I) would begin around April 1, 1991 and be substantiall~ complete in <br /> i 1992. Completion o~ the princips/ spillway, a~xiltary spillway, pedestrian <br /> bridge, and asphalt pevin~ could be extended past this date but would likely <br /> not require continuous full time work. The construction schedule indicates a <br /> I possible 12 week winter 1992 shut-down. <br /> <br /> I <br /> I ., ~ LAW ENGINEERING <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.