Laserfiche WebLink
! <br />! <br /> i _~ Staff Analysis <br /> This petition (91-06) is to a11o~ construction of a concrete mixing plant by <br /> IConcrete Supply, Inc. The rezoning request is from C-4 to 1-2/SU, limiting <br /> the use to the proposed concrete plant on the 3.51 acre tract proposed <br /> for rezoning, <br />I The staff has contacted Concrete Supply and requested they provide additional <br /> information on the proposed plant. Some of this information is attached, <br /> including a site plan sketch, of the proposed site. The proposed operation <br /> I will act primarily as a mixing plant, with a minimum of personnel stationed <br /> at the plant {1-3). <br /> <br /> Water will be provided by the extsting water line down Highway 2g, with sewer <br /> being provided by septic tank. Concrete Supply will be required to'conform <br /> with State requirements for particulate matter and settling ponds to handle <br /> iwater used to clean equipment. <br /> <br /> The developer has contacted HCOOT and will provide a deceleration lane on <br /> southbound Highway 2g and widen northbound Highway 2g. The developer <br /> m also relocate the median crossing to provide direct access to the road <br /> serving this property. <br /> <br /> m The Cabarrus County Land Development Guide shows conlnercial development <br /> along Highway 29. This property does not have frontage on ~ighway 2g, and <br /> has natural screening. The staff does not feel this rezoning will impact <br /> future co~mnercial develop~nt along Highway 2g, and reconeend approval of <br /> Ithis rezoning request. <br /> <br /> i <br /> I <br /> m <br /> <br /> ! <br /> I <br />,m <br /> <br /> <br />