My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG19910617
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
1991
>
AG19910617
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2003 9:14:51 AM
Creation date
11/27/2017 12:03:33 PM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
6/17/1991
Board
Board of Commissioners
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
208
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~m <br /> <br /> the County Engineer prior to beginning any <br /> construction. Said construction plans shall be <br /> m prepared to County standard plan and profile. <br /> 8. The Applicant further agrees that upon approval of said <br /> Contractor and sanitary sewer plans by the County <br /> I the of said requesting <br /> Engineer ~ <br /> properties <br /> sanitary sewer shall guarantee the installation of the <br /> required sanitary se~erage system. Upon completion of <br /> <br /> thereof shall be given by the Applicant to the County <br /> Engineer, who shall cause a final inspection Of the <br /> m sewerage system to ba made and shall within thirty (30) <br /> days accept the system for the County, provided ali <br /> stipulations of this contract have been met. <br /> <br /> m 9. After completion of all construction, the Applicant <br /> shall furnish the original drawings of all construction <br /> <br /> Utility Department marked "As-Built". The final plans <br /> shall show the actual condition in ~hi~h the facility <br /> <br /> m was physically constructed and/or installed. Further, <br /> the final plans shall shoL~ the correct location of the <br /> facility as it related to easements~ right-of-way <br /> lines~ property lines, buildings, underground and/or <br /> m overhead utility lines~ road~ays~ railroads~ and all <br /> other physical features that mould have any effect or <br /> influen~ upon the constructed facility. The <br /> I Professional Engineer employed to design the facility <br /> shall be responsible for the accuracy and completeness <br /> of the facility as shown on the final edition of the <br /> original construction plans. These original drawings <br /> Ishall the propl~rty of County. <br /> become <br /> the <br /> <br /> 10. It is further understood and agreed that if any of the <br /> <br /> in any manner to pressure lines of lift stations, the <br /> design of such pressure lines and lift stations shall <br /> be in accordance ~ith the requirements of the Cabarrus <br /> County Utility Department and shall be designed to <br /> <br /> anticipated flows in the drainage ~rea in ~hich the <br /> m lines are located. <br /> 11. It is understood and agreed that when the described <br /> m sewer system is constructed according to the plans, <br /> specifications, and standards of the Cabarrus County <br /> Utility Department, said sewer system shall <br /> m automatically become the property of the County without <br /> cost to the County,. and without further agreement in <br /> connection therewith. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.