My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG19910819
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
1991
>
AG19910819
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2003 9:14:51 AM
Creation date
11/27/2017 12:03:55 PM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
8/19/1991
Board
Board of Commissioners
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
agreed to accommodate additional scope required Io monilor the project through <br />completion. <br /> <br />5.1.3.2. Mitigation Plan <br /> <br />5.1.3.2.1. For Preconstr~ction Phase services including design ~d bidding <br />administration sen,ices, payment shall be a LU]~P SLIM of Ninety-Six Thousand Doll.s <br />~d 00/100 Cents ($96,000). This fee is based on assumption con.ned in Exhibit B, <br />Mitigation Pin Sco]~ of Sen,ice. <br /> <br />5.1.3.2.2. For the construction phase services including administration of the <br />construction contract as described in paragraph ] .6.2, payment shall be a LUMP SUM <br />of One Hundred Thirty-Nine Thousand Dollars ~nd 00/100 Cents ($139,000). Based on <br />work done on the preconstruction phase, cert,~in items in the final design may change in <br />scope. If this occurs, the LUMP SUM fee shall be adjusted as mutually agreed for <br />accommodale the change in final SCOld. <br /> <br />5.1.3.2.3. For post construction phase (mo~iloring and m~inten~ce), the amount and <br />method of compensation sh~]l be negotiated following the construction phase after the <br />final scope of monitoring ~ be ~scert~ined. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.