My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG19911021
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
1991
>
AG19911021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2003 9:14:52 AM
Creation date
11/27/2017 12:04:04 PM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
10/21/1991
Board
Board of Commissioners
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section B- Surcharae ProqNa~ <br /> <br /> CONCORD shall include in the Sewer Use Ordinance the allowable <br /> treatment plant influent design discharge limits for BOD, COD, TSS <br /> and NH~. Provided the Rocky River Regional Wastewater Treatment <br /> Plant has adequate capacity and the capability to comply with the <br /> NPDES Permit, a non-domestic discharger will be permitted to <br /> discharge in excess of the design limits provided a surcharge is <br /> paid and there is no adverse impact on the Rocky River Regional <br /> Wastewater Treatment Plant or its operation.- <br /> <br /> Section C- Compensation <br /> <br />1) CONCORD will establish the basis for a Surcharge Rate <br /> Structure uniform throughout the systems of CONCORD and COUNTY <br /> and consistent with current state and federal regulations. <br /> CONCORD will review and the <br /> update <br /> surcharge <br /> rate <br /> necessary to comply with the ordinance and to recover all the <br /> cost incurred by the excess loadings (e.g. Surcharge Fees). <br /> Any proposed changes and modifications to the Surcharge Rate <br /> Structure will be reviewed with the COUNTY before adoption. <br /> <br />2) CONCORD will include in and as a separate part of the <br /> Surcharge Rate Schedule Program, a Rate Schedule which shall <br /> recover the cost for administering and monitoring of the <br /> Pretreatment and Surcharge Programs (e.g. Program Fees and <br /> Sample Fees). <br /> <br />3) The Rate Schedules for the Pretreatment and Surcharge <br /> Programs, described in number 1 and 2, shall be reviewed by <br /> CONCORD annually to insure that each non-domestic source is <br /> paying a reasonable fair share. Each industry or non-domestic <br /> user, subject to the Pretreatment and Surcharge Programs shall <br /> be billed directly by the River <br /> Rocky <br /> Regional <br /> Wastewater <br /> Treatment Plant. Bills are payable within 20 days from the <br /> billing date. <br /> <br />4) The COUNTY agrees to provide the Rocky River Regional <br /> Wastewater Treatment Plant with monthly water consumption data <br /> to be used for monthly Surcharge Billing for each non-domestic <br /> user subject to the Pretreatment and Surcharge Programs, in <br /> accordance with CONCORD's Sewer Use Ordinance. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.