Laserfiche WebLink
m <br /> ! <br /> I any work or materials condemned as unsatisfactory by <br /> the County Engineer and shall rebuild and replace same <br /> to the standard required by the specifications, all at <br /> his o~n expense and in default thereof, the same may be <br /> done by the District and the cost charged against the <br /> Applicant. Final connection to the District's water <br /> system will not be permitted until all work has been <br /> approved by the Director and a letter of certification <br /> by the designing Engineer received by the Cabarrus <br /> I County Utility Department. <br /> 4o The District shall own all facilities installed under <br /> <br /> i this contract and shall collect all revenues for service <br /> rendered from said water mains at the rate set forth in <br /> the rules and regulations of the District. <br /> <br /> 5. Any connections~ additions, or extensions to the <br /> herein described water lines shall be made only upon <br /> ~ritten permission of the District. <br />i &. The Applicant shall employ at his own proper cost and <br /> expense a Professional Engineer registered in North <br /> <br /> i Carolina who shall design, lay out and supervise the <br /> construction of these certain water lines. Complete <br /> plans and profiles detailing all proposed construction <br /> and equipment must be approved by the Director prior to <br />I beginning any construction. Said construction plans <br /> shall be prepared District standard plan and profile <br /> paper as per District standards. <br />I ?. The Applicant further agrees that upon approval of said <br /> Contractor and water plans by the Director, the owner <br /> of said properties requesting water service shall <br />I the installation of the water <br /> guarantee <br /> required <br /> system. Upon completion of the water system as <br /> described~ written notice thereof shall be given by the <br />i Applicant to the Director~ who shall cause a final <br /> inspection of the water system to be made and shall <br /> within thirty (30) days accept the system for the <br />i District~ provided all stipulations of this contract <br /> have been met. <br /> <br /> 8. After completion of all construction, the Applicant <br /> shall furnish the original dra~ings of all construction <br /> plans~ revised to show any and all revisions <br /> encountered during construction, to the District marked <br />i "As-Built". The final plans shall show the actual <br /> condition in which the facility was physically <br /> constructed and/or installed. Further~ the final plans <br /> <br />I shall show the correct location of the facility as it <br /> related to easements~ right-of-way lines~ property <br /> lines, buildlngs, underground and/or overhead utility <br /> lines, roadways, railroads, and all other physical <br /> features that would have any effect or influence upon <br /> <br /> <br />