Laserfiche WebLink
any work or materials condemned as unsatisfactory by <br /> the County Engineer and shall rebuild and replace same <br /> 1 to the standard required by the specifications, all at <br /> his own expense and in default thereo~ the same may be <br /> ~ done by the District and the Cost charged against the <br /> ~i Applicant. Final connection to the District's ~ater <br /> m will be until all work has been <br /> permitted <br /> approved by the Director and a letter of certification <br /> by the designing Engineer received by the Cabarrus <br />im County Utility Department. <br /> q. The District shall own all facilities installed under <br /> m this contract and shall collect all revenues for service <br /> rendered from said water mains at the rate set forth in <br /> the rules and regulations of the District. <br /> <br /> m 5. connections, additions, extensions to the <br /> Any <br /> herein described water lines shall be made only upon <br /> ~ritten permission of the District. <br /> m &. The Applicant shall employ at his own proper cost and <br /> e~pense a Professional Engineer registered in North <br /> m Earolina who shall design, lay out and supervise the <br /> construction of these certain water lines. Complete <br /> plans and profiles detailing all proposed construction <br /> and equipment must be approved by the Director prior to <br /> m beginning any construction. Said construction plans <br /> shall be prepared District standard plan and profile <br /> paper as per District standards. <br /> m ?. The Applicant further agrees that upon approval of said <br /> Contractor and water plans by the Director, the owner <br /> <br /> m of said properties requesting water service shall <br /> guarantee the installation of the required water <br /> system. Upon completion of the water system as <br /> described, written nQtice thereof shall be given by the <br /> m Applicant to the Director, who shall cause a final <br /> inspection of the water system to be made and shall <br /> ~tthin thirty (30) days accept the system for the <br /> m District, provided all stipulations of this contract <br /> <br /> 8. After completion of all construction, the Applicant <br /> m shall furnish the drawings of all construction <br /> plans~ revised to show any and all revisions <br /> encountered during construction~ to the District marked <br /> I "As-Built". The final plans shall show the actual <br /> condition in which the facility was physically <br /> constructed and/or installed. Further~ the final plans <br /> m shall show the correct location of the facility as it <br /> related to easements~ right-of-way lines, property <br /> lines, buildlngs~ undergreund and/or overhead utility <br /> lines, roadways, ratlroads~ and all othe~ physical <br /> m ~eatures that would have any effect or influence upon <br /> <br /> <br />