Laserfiche WebLink
PROJECT A-1 SUMMARY <br /> <br /> project was given first priority based upon the total number <br /> This <br /> of customers that could be served for the least amount of water <br /> main and the cost per customer. The number of customers are only <br /> existing homes, not lots. This is a combination of two projects <br /> so as to keep the cost down and to try to maintain the 2000 if <br /> limit. <br /> <br /> COST ESTIMATE SHEET - WATER MAIN CONSTRUCTION <br /> PROPOSED PROJECT A-l: HWY 200 & VANDERBURG DRIVE OFF HWY 601 <br /> <br /> ITEM NO. DESCRIPTION QUANTITY UNIT PRICE EXTENSION <br /> <br /> A 12" X 12" TAPPING <br /> SLEEVE & VALVE 1 EA 2200.00 $2,200.00 <br /> B BORE, 24" CASING <br /> W/12" CARRIER PIPE 70 LF 80.00 $5,600.00 <br /> C 12" WATER MAIN 1000 LF 18.00 $18,000.00 <br /> D 6" WATER MAIN 800 LF 13.00 $10,400.00 <br /> E 2" WATER MAIN 450 LF 9.00 $4,050.00 <br /> F 12" GATE VALVE I EA 800.00 $800.00 <br /> G 6" GATE VALVE 1 EA 350.00 $350.00 <br /> H 2" GATE VALVE I EA 250.00 $250.00 <br /> I FIRE HYDRANTS <br /> W/GATE VALVE 2 EA 1400.00 $2,800.00 <br /> J 1" BLOW-OFF I EA 500.00 $500.00 <br /> <br />CONSTRUCTION COST $44,950.00 <br />SURVEYING & ENGINEERING $2,250.00 <br />LEGAL & ADMINISTRATIVE $899.00 <br />CONTINGENCIES $1,348.50 <br /> <br />TOTAL PROJECT COST $49,447.50 <br />26 POTENTIAL CUSTOMERS COST PER CUSTOMER $1,901.83 <br /> <br /> <br />