My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG19911202
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
1991
>
AG19911202
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2003 9:14:55 AM
Creation date
11/27/2017 12:04:12 PM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
12/2/1991
Board
Board of Commissioners
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT G SUHHARY <br /> <br /> This project was given second priority based upon the total number <br /> of customers served per linear foot of water main. The number of <br /> customers are only existing homes, not lots. <br /> <br />COST ESTIMATE SHEET - WATER MAIN CONSTRUCTION <br />PROPOSED PROJECT G: HESS ROAD TO OLD AIRPORT ROAD <br /> <br />ITEM NO. DESCRIPTION QUANTITY UNIT PRICE EXTENSION <br /> <br /> A 6" WATER MAIN 2800 LF 13.00 $36,400.00 <br /> B 6" GATE VALVE 2 EA 350.00 $700.00 <br /> C FIRE HYDRANTS <br /> W/GATE VALVE 3 EA 1400.00 $4,200.00 <br /> <br />CONSTRUCTION COST $41,300.00 <br />SURVEYING & ENGINEERING $2,800.00 <br />LEGAL & ADMINISTRATIVE $826.00 <br />CONTINGENCIES $1,239.00 <br /> <br />TOTAL PROJECT COST $46,165.00 <br />23 POTENTIAL CUSTOMERS COST PER CUSTOMER $2,007.17 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.