Laserfiche WebLink
PROJECT K SUMMARY <br /> <br /> This project was given third priority based upon public safety. <br /> This is part of the Midland Area that the Board has been trying to <br /> extend water into, it is the area where the majority of responses <br /> to the survey cards was positive. <br /> <br /> COST ESTIMATE SHEET - WATER MAIN CONSTRU~I'~UN <br /> PROPOSED PROJECT K: JIM SOSSAF~%N ROAD NORTH OF HWY 24-27 <br /> <br /> ITEM NO. DESCRIPTION QUANTITY UNIT PRICE EXTENSION <br /> <br /> A 8" X 8" TAPPING <br /> SLEEVE & VALVE 1 EA 1500.00 $1,500.00 <br /> B BORE, 12" CASING <br /> W/6" CARRIER PIPE 24 LF 70.00 $1,680.00 <br /> C 8" WATER MAIN 2000 LF 16.00 $32,000.00 <br /> D 8" GATE VALVE 2 EA 500.00 $1,000.00 <br /> E 6" GATE VALVE 1 EA 350.00 $350.00 <br /> F FIRE HYDRANTS <br /> W/GATE VALVE 3 EA 1400.00 $4,200.00 <br /> <br />CONSTRUCTION COST $37,550.00 <br />SURVEYING & ENGINEERING $2,000.00 <br />LEGAL & ADMINISTRATIVE $751.00 <br />CONTINGENCIES $1,126.50 <br /> <br />TOTAL PROJECT COST $41,427.50 <br />14 POTENTIAL CUSTOMERS COST PER CUSTOMER $2,959.11 <br /> <br /> <br />