Laserfiche WebLink
PROJECT D SUHMARY <br /> <br /> This project was given fifth priority based upon total number of <br /> customers served per linear foot of water main and the total cost <br /> per customer. <br /> <br /> COST ESTIMATE SHEET - WATER MAIN CONSTRUCTION <br /> PROPOSED PROJECT D: COLD SPRINGS ROAD SOUTH OFF HWY 601 <br /> <br /> ITEM NO. DESCRIPTION QUANTITY UNIT PRICE EXTENSION <br /> <br /> A 12" X 6" TAPPING <br /> SLEEVE & VALVE 1 EA 1800.00 $1,800.00 <br /> B BORE, 12" CASING <br /> W/6" CARRIER PIPE 40 LF 70.00 $2,800.00 <br /> C 6" WATER MAIN 2000 LF 13.00 $26,000.00 <br /> D 6" GATE VALVE 1 EA 350.00 $350.00 <br /> E FIRE HYDRANTS <br /> W/GATE VALVE 2 EA 1400.00 $2,800.00 <br /> <br />CONSTRUCTION COST $33,750.00 <br />SURVEYING & ENGINEERING $2,000.00 <br />LEGAL & ADMINISTRATIVE $675.00 <br />CONTINGENCIES $1,012.50 <br /> <br />TOTAL PROJECT COST $37,437.50 <br />12 POTENTIAL CUSTOMERS COST PER CUSTOMER $3,119,79 <br /> <br /> <br />