Laserfiche WebLink
any work or materials condemned as unsatisfactory by <br /> the County Engineer and shall rebuild ara replace same <br /> to the standard required by the specifications, all at <br /> his own expense and in default thereof, the same may Oe <br /> done by the District and the cost'charged against the <br /> Applicant. Final connection to the District's water <br /> system will not be permitted until all work has been <br /> approved by the Director and a letter of certification <br /> by the designing Engineer received by the Cabarrus <br /> County Utility Department. <br /> <br /> 4. The District shall' own all facilities installed under <br /> this contract and shall collect all revenues for service <br /> rendered from said water mains at the rate set forth in <br /> the rules and regulations of the District. <br /> <br /> 5. Any connections, additions, or exteqsions to the <br /> herein described water lines shall be made only upon <br /> written permission of the District. <br /> <br /> 6. The Applicant shall employ at his own proper cast ara <br /> expense a Professiona] Engineer registered in North <br /> Carolina who shall design~ lay out and supervise the <br /> construction of these certain water lines. Complete <br /> plans and profiles detailing all proposed construction <br /> and equipment must be approved by the Director prior to <br /> beginning any construction. Said construction plans <br /> shall be prepared District standard plan an~ profile <br /> paper as per District standards. <br /> <br />?. The Applicant further'agrees that upon approval of said <br /> Contractor and water plans by the Director, the owner <br /> of said properties requesting ~ater service shall <br /> guarantee the installation of the required water <br /> system. Upon completion of the water system as <br /> described, written notice thereof shall he'given by the <br /> Applicant to the Director, who shall cause a final <br /> in~ection of the water system to be made and shall <br /> within thirty (30) days accept the system for the <br /> District, provided all stipulations of this contract <br /> have been met. <br /> <br />8. After completion of all construction, the Applicant <br /> shall furnish the original drawings of all construction <br /> plans, revised to show any and all revisions <br /> encountered during ~onstnuction, to the District marked <br /> "As-Built". The final plans shall show the actual <br /> condition in which the facility was physically <br /> constructed and/or installed~ Further, the final plans <br /> shall show the connect location of the facility as it <br /> related to easements, night-of-way lines, p~operty <br /> lines, buildings, under,round and/or overhead utility <br /> lines~ roadways, railroads, and all other physical <br /> features that would have any effect or i~luence upon <br /> <br /> ! <br /> <br /> <br />