Laserfiche WebLink
If it is a con'.~truction project that will not <br /> more than $7'.%,000 ;~nd tl%~, wo~'k i~.~ to bc done by <br /> Co%~nty personnel. <br /> <br />Dividing contracts in order to ~vade these provisions is prohibited <br /> <br />]:or a building contract requiring tho expenditure of ~.100,000 or <br />more, :~c'para~u :;l)ecillcat.[ong: must be p]~,pnt'ad for ~he following <br /> <br /> 1. Heating, ventilating, air conditioning nnd accomsorio~ <br /> (mepa~atoly or combined into one conductiw~ ::y~:tem) and <br /> /or refrigeration) for cold storage, (wi%ere the cooling <br /> <br /> 2. Plumbing and gas fittin(;~ and acceusorie~:; <br /> <br /> 3. Electrical wiring and inntallatiOn~]; ;~nd <br /> <br /> alteration, or repair of any building referred to above <br /> For which work i~: not included .in the above-ii,:tuG throe <br /> <br />Separate bids must be received on each branch of work, and the <br />contract for each branch m%~ut bo awarded to contl;actorf~ regularly <br />onga,~od in th{~i~ re~:pective line o~' week. Projects m,~y b~ <br /> <br />When the estimated co~;t o[' the wo~k to be perfon%%f,d in any single <br />bcanch i~ le~n than ~10,000, ~he ~:am~, may bo included in the <br /> <br />tot~l project cost. <br /> <br />Sepnrate bids nrc not required for tho purchase and erection of <br />relocatdble or pref;d;ricateel building e>;cept for ~}'le po~'tion o~' <br /> <br />The County also has the option to uso the [:ingle-primo contract <br />:~yGtom an{l prequalify bidders for all con~truction~contracto. <br />Tho County will u~.;~.~ thlf: option when it is deemed tho most <br />beneficial to tho project being untlertaken. If thi~: <br />chosen, bids will be ~cc(.ptod undo~ tho ~ame conditions a:] listed <br />above ;~nd the coati'act will Do awarded to tho .[ow~i;t ro~pon~;iblo <br />bidder or bidder~: 1o~' the total project. <br /> <br /> <br />