My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG19900806
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
1990
>
AG19900806
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2003 9:14:30 AM
Creation date
11/27/2017 12:05:30 PM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
8/6/1990
Board
Board of Commissioners
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
the County Engineer and shall rebuild and replace same <br /> to the standard required by the specifications, all at <br /> <br /> done by the District and the cost charged against the <br /> Applicant. Final connection to the District's water <br /> system will not be permitted until all work has been <br /> approved by the Director and a letter of certification <br /> by the designing Engineer received by the Cabarrus <br /> County Utility Department. <br /> <br /> The District shall own all facilities installed under <br /> <br /> rendered from said water mains at the rate set forth in <br /> the rules and regulations of the District. <br /> <br /> herein described water lines shall be made only upon <br /> written permission of the District. <br /> <br /> &. The Applicant shall employ at his own proper cost and <br /> expense a Professional Engineer registered in North <br /> Carolina who shall design, lay out and supervise the <br /> <br /> plans and profiles detailing all proposed construction <br /> and equipment must be approved by the Director prior to <br /> beginning any construction. Said construction plans <br /> shall be prepared District standard plan and profile <br /> paper as per District standards. <br /> <br />?. The Applicant further agrees that upon approval of said <br /> <br /> of said properties requesting water service shall <br /> guarantee the installation of the required water <br /> system. Upon completion of the water system as <br /> described, written notice thereof shall be given by the <br /> Applicant to the Director, who shall cause a final <br /> inspection of the water system to be made and shall <br /> within thirty (30) days accept the system for the <br /> District, provided all stipulations of this contract <br /> <br />8. After completion of all construction, the Applicant <br /> shall furnish the original drawings of all construction <br /> plans, revised to show any and all revisions <br /> encountered during construction, to the District marked <br /> "As-Built"° The final plans shall show the actual <br /> condition in which the facility was physically <br /> constructed and/or installed. Further, the final plans <br /> shall show the correct location of the facility as it <br /> related to easements, right-of-way lines, property <br /> lines, buildings, underground and/or overhead utility <br /> lines, roadways, railroads, and all other physical <br /> features that would have any effect or influence upon <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.