Laserfiche WebLink
situation. D£H reserves the right to assume lead. <br /> authority vhenever necessary. <br /> iV. Well Construction Duties <br /> Conduct veil inspections and other~lse co~unicate vith the <br /> groundva~er industry to insure that DEH yell construction <br /> standards are met. <br /> V. Reporting duties <br /> Submit timely reports as required to DEH concerning Articles I <br /> - IV above. <br /> VI. Work Plan Duties <br /> Submit a york plan to DEH nn an annual basis containing a <br /> description of the methods, procedures~ and protocols to be <br /> used and the responsibilities for both D£H and the Board. The <br /> detailed york plan viii be negotiated on at least an annual <br /> basis. <br /> ?E~ALTI~S - The DEH shill retain exclusive authority a~ld resp~nsibllizy for <br /> the assessment of sdministrative penalties or for instituting <br /> legal action for violations of State statutes and regulations. <br /> <br />COORDII/ATION 0F The staffs of DEH and the Board viii make all reasonable <br />A~TIVlTI~S <br /> efforts to coordinate activities, h'hea coordination is not <br /> <br /> possible, nothing viii preclude either DEH or the Board froa <br /> conducting its activities unassisted. In this instance, <br /> activities rill be coordinated as soon as possible after :he <br /> activity. <br /> <br />FOLLO~-UP All problems or violations of environmental lays or regulations <br />ACTIVITIES <br /> found that are the responsibility of DEH shall be reported to <br /> <br /> and coordinated through the DEH ReBlonal Office. <br /> <br /> <br />