My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG19901015
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
1990
>
AG19901015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2003 9:14:33 AM
Creation date
11/27/2017 12:05:52 PM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
10/15/1990
Board
Board of Commissioners
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
cHANGE Dis.;bu,lon <br /> ORDER OWNER [] <br /> ARCHITECT [] <br /> AIA DOCUMENT G?O1 CONTRACTOR [] <br /> FIELD [] <br /> OTHER [] <br /> <br /> PROJECT: An Addition to the Cab. Co. CHANGE ORDER NUMBER: <br /> (name. address) Dept. of Social Services <br /> 735 Cabarrus Ave.West, Concord, N.C. INITIATION DATE: <br /> TO (Contraclor): <br /> '--1_ ARCHITECT'S PROJECT NO: <br /> ~.K. Browne Construction Co.~-n~)NTRACTFOR: General Construction <br /> P.O. Box 25892 <br /> Charlotte, N.C. 28212 <br /> '" J CONTRACT DATE: May g; 1990 <br /> <br /> You are directed Io make the following changes in this Contract: <br /> <br /> Remove rock from site as follows: <br /> 70 cubic yards in building proper(30' x 8' x 7.87~)% 27 cf./.cy <br /> 31~ cubic yards in south areaway(18' x 6j x 7.87')-:27 cf/cy <br /> 19 cubic yards in drive parallel to Hwy. 601(17' x 20' x 1.5)'.-27 cf/cy <br /> 1 cubic yard at curb towards fairground <br /> 121~ cy x $85/cy = $10,327.50 <br /> $1,032.75 (10%) <br /> ADD $11,360.25 <br /> <br /> Remove rock and extend storm water piping trenches by approximately <br /> 50 ft. to avoid additional rock. <br /> ADD $935.00 <br /> <br /> The original (Contract Sum) (Guaranteed Maximum Cost) was ........................... $ $ 38, 052.00 <br /> <br /> Net change by previously authorized Change Orders ................................... $ 0 <br /> The (Conltact Sum) (Guaranteed Maximum Cost) prior to Ihls Change Order was .......... $ S 38,0S 2.00 <br /> The (Contract Sum) (Guaranteed .%taximum Cost) will be (increased) <br /> by Ibis Change Order ......................................................... $ 12,295.25 <br /> .The new (Contract Sum) (Guaranteed Maximum Cost) including this Change Order will be ... $ 5 S 0 ~ 347.25 <br /> ~'he Conlract Time .,viii be (increased) (decreased) (unchanged) by ( ) Days. <br /> The Date o( Subslanlial Complelion as of the date of Ihls Change Order Iherefore is <br /> <br />George A. Griffin Associates Construction Co. Cabarrus Co. Commissioner <br /> , , . D^,E ~' :~'-9'~ o.~,~ <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.