My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG19901105
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
1990
>
AG19901105
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2003 9:14:33 AM
Creation date
11/27/2017 12:05:57 PM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
11/5/1990
Board
Board of Commissioners
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GEORGE A. GRIFFIN <br />TELEPHONE 7041786.0181 - 5 UNION STREET SOUTH - <br /> <br /> 18 October 90 .... <br /> Cabarrus County Commissioners our ] 9 ]~0. <br /> Lock Box 707 <br /> Concord, N.C. 28026 <br /> <br /> We propose to do a fea~lbility study for the use and exchange of <br /> property having to do with the four acre site that the School <br /> System has on the North side of Highway 49 at Central Cabarrus <br /> High School and the site the county has off of Highway 601 that <br /> Joins the School Bus Garage property. <br /> <br /> Enclosed is a drawing, Plan ~1, which shows how the School Bus <br /> Site might be enlarged by filling the perimeter of the County <br /> property to extend the Bus Site. The extent of fill as to depth <br /> and length is hypothetical. <br /> <br /> I propose, on behalf of the School Board, that independent <br /> appraisals of both properties be secured and that the amount of <br /> difference in values be used to fill as much at the County Site as <br /> can be had for the money. <br /> <br /> We also propose to do a schematic plan for an Ambulance Building. <br /> This would be in the form of a drawing which would show the floor <br /> plan of the building, location on the site with drives and parking <br /> and how future expansion would fit into the plan. <br /> <br /> We would prc. pose to work on a hourly basis as follows: <br /> <br /> Principal Architect ............... $55/hr. <br /> Architect ......................... 50/hr. <br /> Draftsman ......................... 35/hr. <br /> Secretary ......................... 15/hr. <br /> <br /> The total paid for the above services would be deducted from the <br /> total Architectural fee if we are retained to follow thr~ with <br /> full architectural services. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.