Laserfiche WebLink
7. Traffic control devices shall be the responsibility <br />of the Contractor as part of %he construction contract. <br /> <br /> 8. Traffic during construction of %he pro3ec~ shall <br /> <br />be maintained a~ al1 ~mes on NC 136. The reservoir shall <br />not be flooded un~l suffJcJen~ pavemen~ has been constructed <br />on NC 136 a~ ~he h~gher elevation %o maintain ~raff~c. <br /> <br /> 3 <br /> <br /> <br />