Laserfiche WebLink
CR~AY PARK <br /> <br /> Cost Estimates <br /> <br /> Tra~l Construction Cost <br /> <br /> (1) Trai! - Approximately 1800' ~' 27,000.00 <br /> @ ~18.00 per l£near foot <br /> <br /> (2) Steel Br£dge - 50' 28,000.00 <br /> <br />Support Facilities <br /> <br /> (1) Protective Fencing 7,$00.00 <br /> (2) Parking, Benches, Trash Cans, etc. 1,000.00 <br /> (3) 8ire Preparation 3,000.00 <br /> <br />Enllneerin~/Surveyin~ 5,000.00 <br />Si~nage 500.00 <br />Land lequisitien (By Donation) 240500.00 <br />Contingency 3,500.00 <br /> <br /> Total Project Cost ~ 100~000.00 <br /> <br /> <br />