Laserfiche WebLink
Page g of 15 <br /> <br /> accordance ~ith this Section or is withdrawn from the transportation <br /> service, whether by planned withdrawal or casualty loss, the Contractor <br /> shall immediately contact the Department. If the Department determines that <br /> Project equipment is not being fully utilized, the Contractor shall transfer <br /> or dispose of the Project equipment at the direction of the Department. <br /> Failure to carry o(~t the requirements set forth in this Section shall <br /> constitute a breach of contract and, after notification by the DePartment, <br /> may result in termination of the Agreement. <br /> <br /> Section 11. Maintenance and Inspection. The Contractor shall maintain <br />all project equipment at a high level of cleanliness, safety, and mechanical <br />soundness. The Department shall conduct inspections, not less than once <br />every two (2) years, to confirm proper maintenance pursuant to this Section <br />and use compliance in accordance with Section 11 of this Agreement. The <br />Contractor shall maintain all records of maintenance deemed necessary and <br />appropriate by_the Department until disposition of Project'equipment. <br /> <br /> Section 12. Insurance. The Contractor shall be responsible for <br />protecting the federal and state financial interests in project equipment <br />purchased under this Agreement throughout the useful life of the equipment. <br />The Contractor shall provide, on an annual basis and in such manner as the <br />Department may require, written documentation that all equipment is insured <br />against loss in an amount equal to or greater than ninety (9D%) percent of <br />the real value of the equipment. Failure of the Contractor to provide <br />adequate insurance shall be considered a breach of contract and, after <br />notification by the Department, may result in termination of this Agreement. <br /> <br /> Section 13. Useful Life of Project Equipment. "Useful life" for all <br />Project equil~r~nt shall be determined by the Department. Upon the end of <br />the. period of useful life, the Contractor may dispose of Project equipment <br /> <br /> <br />