My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG19890320
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
1989
>
AG19890320
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2003 9:14:24 AM
Creation date
11/27/2017 12:06:26 PM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
3/20/1989
Board
Board of Commissioners
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROPOSED CHANGES <br /> <br />Watershed Overlay (WSO) District <br /> <br />All lots in the following watersheds; <br /> <br /> 1. Coddle Creek <br /> 2. Butch Buffalo Creek <br /> <br />Shall meet the following requirements: <br /> <br /> 1. All lots within the drainage basin, within ~ mile of the high water <br /> mark for the reservoirs shall have a minimum square of footage of <br /> two (2) acres. <br /> <br /> 2. All lots in ~he remaining area Of drainage basin for the reservoirs <br /> shall have a minimum square footage of 40,000 square feet or meet <br /> requirements of the Cabarrus County Zoning Ordinance, whichever is <br /> more stringent. <br /> <br />In addition, the following requirements shall apply to property within the <br />drainage basin, within½ mile of the high water mark for reservoir: <br /> <br /> 1. No commercial or industrial development shall be permitted. <br /> <br /> 2. A 150 foot vegetative buffer shall be maintained from the normal <br /> pool level on all property adjoining the reservoir, no permanent <br /> structures shall be allowed in this buffer area. <br /> <br /> 3.No industrial or commercial hazardous material shall be used or <br /> stored in this ~ mile area. <br /> <br /> 4. For all new developments, plans submitted for approval shall include <br /> detention of the first ½ inch of runoff. <br /> <br />For the remaining watershed area, the following requirements shall be met: <br /> <br /> 1.For all new developments, plans submitted for approval shall <br /> include detention of the first ½ inch of runoff. <br /> <br /> 2.A 50 foot vegetative buffer shall be maintained adjacent to all <br /> perennial streams. <br /> <br /> Special Use Provisions - New development not complying with the above requirements <br /> could be allowed on a case-by-case basis if special safeguards against contamination <br /> are proposed and approved by the appropriate state authority. <br /> <br />All proposed developments in the desi'gnated watersheds shall meet these requirements. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.