Laserfiche WebLink
3, 10 If more than one prime contract is to be awarded for construction, <br /> materials, equipment and services for the entire Project. designate a <br /> person or organization to have authority and responsibility for <br /> coordinating the activities among Ihe various prime contractors. <br /> <br /> 3.11 Furnish to ENGINEER data or estimated figures as to OWNER's anticipated <br /> costs for related services to be provided by others for OWNER so that <br /> ENGINEER may make the necessary findings to support opinions of probable <br /> Total Project Costs. <br /> <br /> 3.12 provide labor and safety equipment tO open and protect manholes and/or to <br /> operate valves and hydrants as required by the ENGINEER. <br /> <br />3.13 Give prompt written notice to ENGINEER whenever OWNER observes or <br /> otherwise becomes aware of any development that affects the scope or <br /> timing of ENGINEER's services, or any defect or non-conformance in the <br /> work of a. ny Contractor <br /> <br />3.14 Furnish. or direct ENGINEER to provide Special Services as stipulated in <br /> paragraph 2.1 of this Agreement or other services as required. <br /> <br />3.15 Bear all costs incident to compliance with the requirements of this <br /> Section 3. <br /> <br />SECTION 4. PERIODS OF SERVICE <br /> <br />4.1 The provisions of this Section 4 and the various rates of compensation for <br /> ENGINEER's services provided for elsewhere in Ihis Agreement have been <br /> agreed to in anticipation of the orderly and continuoas progress of the <br /> ENGINEER's services through completion of the Design. If in Exhibit A <br /> "Further Description of Basic Engineering Services and Related Matters" <br /> specific periods of time for rendering services are set forth or specific <br /> dates by which services are to be completed are provided and if such dates <br /> are exceeded through no fault of ENGINEER. all rates, measures and amounts <br /> of compensation provided herein shall be subject to equitable adjustment. <br /> <br />4.2 If OWNER has requested significant modifications or changes in the general <br /> scope, extent or character of the Project, the time of performance of <br /> ENGINEER's services and his variou~ rates of compensation shall be adjust- <br /> ed appropriately. <br /> <br />4.3 l'f ENGINEER's services for design of this Project are delayed or suspended <br /> in whole or m part by OWNER for more than three months for reasons beyond <br /> ENGINEER's control. ENGINEER shall on written demand to OWNER (but without <br /> termination of this Agreement) be paid in full for all services rendered <br /> to date of delay or suspension. If such delay or suspension extends for <br /> more than three months for reasons beyond ENGINEER's control, the various <br /> Page 6 of l0 <br />DN 3/85 <br /> <br /> <br />