Laserfiche WebLink
Subflooring:, <br /> <br /> Remove old carpet.or, winyl' and install <br /> <br /> plywood subfloorinq entire house. Level <br /> <br /> floor,..between dininq,,room and kitchen; <br /> <br /> Floors shall be ready for cove,ring.. CUt . <br /> off doors as required for floor covering., .... <br /> 964.00 <br /> <br /> Interior,,Doors,:. <br /> <br /> 10, Install new_boors, nrehunq .with i~as%ngs <br /> and hardware. Total 5 and 1 oloset,,dogr.,.., <br /> See plan and specs. Stain.to,match <br /> <br /> paneling. , ,. <br /> 951.00 <br /> Exterior Doors: <br /> <br /> 11. Install new front and back dogr,_,.co~plete, <br /> prehung and ca~inqg and hardware. See <br /> specs. Peep hole or panel, owner'sI <br /> choice. ,,Stain ~o match paneling.~tota% 2). 649.00 <br /> Install storm,,door, back entrance (tota~ 1). 140.00 <br /> <br /> Kitchen: <br /> <br /> 12, Install new base and wall cabinets ~ro~ <br /> <br /> ,. , left of range to wall. Approximately <br /> 5'6!'o ,, Formica splash and top. Stain ...... <br /> See plan and specs. ,~nclud~ all <br /> hardware. 541.00 <br /> <br /> Boxing: <br /> <br />..... 13. Box. in expoged,water pipes .in bedrooms <br /> <br /> 2 and 3. Stain to match canel~nq. 175.00 <br /> <br /> Page 3 of 5 <br /> <br /> <br />