Laserfiche WebLink
CHANGE Dtstdbutiom to: <br /> ORDER OWNER [] <br /> ARCHITECT [] <br /> AIA DOCUMENT G7O? CONTRACTOR [] <br /> FIELD [] <br /> OTHER [] <br /> <br /> PROJECT: Additions and Alterations CHANGE ORDER NUMBER: <br /> (name, address) Cabarrus County ,tail <br /> INITIATION DATE: 08/;?4/89 <br /> TO (Contractor): <br /> F---R.D. '-"-I ARCHITECT'S PROJECT NO: 06o0153-17! <br /> Franklin <br /> Etectrtc <br /> Inc, <br /> CONTRACT FOR.: Electrlca! Construction <br /> P.O. Box 3404 <br /> Concord. NC 28025 <br /> L ~.1 CONTRACT DATE: 12/2]./87 <br /> You are directed (o make the I'ollowing changes in this Contract: <br /> <br /> 1. Furnish a11 labor and materials snd install conduit and wiring to provide a "cable link" <br /> between the Government Center and Cabarrus County Jail. Reference R.O. Franklin Electric <br /> [nc. letter, dated 08/09/89 with cost breakdown attached hereuith. <br /> <br /> A0D ............................... $7,915.00 <br /> <br /> Not valid unlil signed hy both Ihe Owner and Arch(icc(. <br /> Signature of thu Contractor indicates his a§ruemenl herewith, including any adjuslmtnl in the Conlra~l Sum or Contract Time. <br /> <br /> The original (Contract Sum) C~A4g~X~{(flX*X~R~gXT~RX~R~[I~ was ........................... $ ~85,~00.00 <br /> Net change by previously authorized Change Orders ................................... $ 8,962~27 <br /> The (Contract Sum) (~X~X~X~ prior to this'Change Order was .......... $ ]94,56g.~7 <br /> The (Contract Sum)~tR~X~gwill be'(increased) ~X~dXX~K~X ' ' <br /> by this Change Order ............................................ $ 7,915.00 <br /> The ne~'~C~n'tract Sum~ (~~) including th~s Change Order will be ... <br /> The Conlract Time will be ~~(unchanged) by. ( 0 Days. <br /> The Date o~ Substantial Completion as of the date of this Change Order therefore is <br /> <br />~... Address [Address Address <br /> <br /> <br />