Laserfiche WebLink
any work or materials condemned as unsatisfactory by <br /> the County Engineer and shall rebui~ld and r~place ~ame <br /> to the standard required by the specifications, all at <br /> his own expense and in default theneof, the same may be <br /> done by the District. and the cost charged against the <br /> Applicant. Final connection to the District's water <br /> system will not be permitted until all work has been <br /> approved by the Director and a letter of certification <br /> by the designing Engineer receive~ by the Cabarrus <br /> County Utility Department. <br /> <br /> The District shall own all facilities installed under <br /> this contract and shall collect ail revenues for service <br /> rendered from said water mains at t~e rate set forth in <br /> the rules and regulations of the District. <br /> <br />5. Any connections, additions, or extensions to the <br /> herein described water lines shall be made only upon <br /> written permission of the District. <br /> <br />6. The Applicant shall employ at his own proper co~t and <br /> expense a Professional Engineer registered ir: North <br /> Carolina who shall design, lay out and supervise the <br /> censtruction of these certain water lines. Complete <br /> plans and profiles detailing all..~ropose~ construction. <br /> and equipment must De approved by the Director p~ion to <br /> beginning any construction. Said construction plans <br /> shall be prepared District standard plan and profile <br /> paper as per District standards. <br /> <br />?. The Applicant further agrees that upon approval of said <br /> Contractor and water plans by the Director, the owner <br /> of said properties requesting water service shall <br /> guarantee the installation of the required water <br /> system. Upon completion of the water system as <br /> describe~, written notice thereof shall be given by the <br /> Applicant to the Director, who shall cause a final <br /> inspection of the water system to be made and shall <br /> within thirty (30> days accept the system for the <br /> District, provided all stipulations of this contract <br /> have been met. <br /> <br />8. After completion of all construction, the Applicant <br /> shall furnish the original drawings of ali construction <br /> plans, revised to show any and all revisions <br /> encountered during construction, to the District marked <br /> "As-Built". The final plans shall show the actual <br /> condition in which the facility 'was physically <br /> constructed and/or installed. Further, the~final plans <br /> shall show the correct locatien of the facility as it <br /> related to easements, right-of-way lines, pnoperty <br /> lines, buildings, undergnound and/or overhead utility <br /> lines, roadways, railroads, and all other physical <br /> features that would mare a~v effect or influence upon <br /> <br /> <br />