Laserfiche WebLink
any worR or materials condemned as unsatisfactory by <br /> the County Engineer and shall rebuild and replace same <br /> to the standard r~quired by the specifications, all at <br /> his own expense and in default thereof, the same may be <br /> done by the District and the cost charged against the <br /> Applicant. Final connection to the Dis%riot's water <br /> system will not be permitted until all work has Omen <br /> approved by the Director an~ a letter of certification <br /> by the designing Engineer received by the Cabarrus <br /> County Utility Department. <br /> <br /> The District shall own all facilities installed under <br /> this contract and shall collect all revenues for service <br /> rendered from said water mains at the rate set forth in <br /> the rules and regulations of the District. <br /> <br />5. Any connections, additions~ o~ extensions to the <br /> herein described water lines shall be made only upon <br /> writte~ permission o~ the District. <br /> <br />6. The Applicant shall employ at his own proper cost'and <br /> expense a ProfessFonal Engineer~registered in North <br /> Carolina who shall design, lay out and supervise the <br /> construction of these certain ~ater lines. Complete <br /> plans and profiles detailing all proposed construction <br /> and equipment must be approved by the Director prior to <br /> " beginn~hgany construction. Said constructio~ plans <br /> shall be prepared District standard plan and profile <br /> paper as per District standards. <br /> <br />?. The Applicant further agrees that upon approve] of said <br /> Contractor and water plans by the Director, the owner <br /> of said properties requesting water service shall <br /> guarantee the installation of the required water <br /> system. Upon completion of the water system as <br /> described, written notice thereof shall be given by the <br /> Applicant to the Director! who shall cause a final <br /> inspection of the water system to be made and shall <br /> within thirty (30> days accept the system for the <br /> District, provided all stipulations of this contract <br /> have been met. <br /> <br />8. After completion of all construction, the Applicant <br /> shall furnish the original drawings off all construction <br /> plans, .revised to show any and all revisions <br /> encountered during constructian, to the District ma~ked <br /> "As-Built". The final plans shall show the actual <br /> condition in which the facility ~as physical~l¥ <br /> constructed and/or installed. Further, the final plans <br /> shall show the correct location of the facility'as it <br /> related t~ easements, .right'of-way lines~ property <br /> linee, buildings, underground an~/0r o'verhead utility <br /> lines, roadways, railroads, and ~all other physical <br /> features that would have aqy effect or influencm upon <br /> <br /> <br />