My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG19891220
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
1989
>
AG19891220
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2003 9:14:29 AM
Creation date
11/27/2017 12:07:33 PM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
12/20/1989
Board
Board of Commissioners
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
:~CHANGE Disnib~t~o. to: <br />ORDER OW. ER [] <br /> ARCHITECT [] <br />AIA DOCUMENT G701 CONTRACTOR [] <br /> FIELD [] <br /> OTH[R <br /> <br /> PRO)ECT: ~dditibns & Alterations CHANGE ORDER NUMBER:' 6 <br /> (name, address) Cat, arrua County ,.Tail <br /> ~NITIATION DATE: <br /> TO (Contractor): <br /> [-- Cabarrus Construction Co., In~ <br /> ARCHITECT'S <br /> PROJECT <br /> NO: <br /> 86-O153-171 <br /> 26-27 Dolly Avenue CONTRACT FOR: General Construction <br /> P.O. Box 3~17 <br /> Concord, NC 28026 <br /> LAttn: Hike Burris .~ CONTRACT OATE: 12/21/87 <br /> <br /> You are directed to make the (ollowing changes in this Contract: <br /> <br />1, Furnish all labor and materials and provide plate steel shower enclosures, <br /> including painting. Reference Cabarrus Construction Co,, Inc. letters <br /> dated, 07/25/89 and 09/27/89 with cost attached herewith, <br /> <br /> ADD ......................... $1938.00 <br /> <br />2. Furnish all labor and materials and install an exterior ladder from the <br /> low roof area to the high roof. Reference Cabarrus Construction Co., Inc. <br /> letter dated 0~/04/89 with cost, attached herewith. <br /> <br /> ADD ......................... $ 356.50 <br /> <br />3. Furnish all labor and materials and install safety rails around roof unit <br /> per local code. Reference Cabarrus Construction Co., Inc. letter (with <br /> attachments) dated 07/11/89 with cost, attached herewith. <br /> <br /> ADD ......................... ~ 667.33 <br /> **Continued on Page 2 <br /> <br /> The original (Con~ract Sum] ~X~) was .... ' ....................... $ 1 ,q44,150 .O0 <br /> Net change by previously authorized Change Orders ................................... $ <br /> The [Contract Sum)~~X~t~ prior lo this Change Order was .......... $ 1 ~88,600.15 <br /> The (Conlract Sum)X~~X~ wi)l be ~X~R (unchanged) <br /> by this Change Order ......................................................... $ -O- <br /> The new [Conhact Sum) (~,~~ including Ihls Change Order wiJJ be ... $ 1 <br /> The Contract Time will be ~R~ (unchanged) by { 0 ) Days. <br /> The Date of, Substantial Completion ~s of the date of this Change Order therefore is <br /> Auth~ot zed' i :' <br /> CABBA S ounty Board <br /> KIMBALL ASSOCIRTES,P.A. CABARRUS CO~STnUC~ION co.,INC. <br /> <br /> Z~O, ~02 Jefrevaon St. 0o1.1t Avenue ,. c~Narrus-Coun~y Couvtho~ <br /> QW~R <br /> <br /> ~alei~h, NC 2?605 Concord, NC 28025 Concord, NC 28025 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.