My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG19880321
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
1988
>
AG19880321
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2003 9:14:23 AM
Creation date
11/27/2017 12:07:58 PM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
3/21/1988
Board
Board of Commissioners
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
172
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> <br />it. The Applicant and the applicants contractor <br /> agree lo guarantee all'work and materiels for a <br /> period of one yea; after a successful f inel <br /> inspection. <br /> <br />t2. After completion of all construction, the Applicant <br /> shall furnish the original drawings of all <br /> construction plans, revised to show any and all <br /> revisions encountered during construction, lo the <br /> District marked "As-Built". The final plans shall <br /> show the actual condition in which the facilily was <br /> physically constructed and/or installed. Further, <br /> the final plans shal I show the correct location of <br /> the facility as it relates to easements, <br /> right-of-way lines, buildings, underground and/or <br /> overhead utility lines, roadways, railroads, and <br /> all other physical fealures Ihal would have any <br /> effect or influence upon the construcled facility. <br /> The Professional Engineer employed to design Ihe <br /> faci I i ty shall be responsible for the accuracy and <br /> Completeness el the facility as shown on the f ina) <br /> edition of the or iginal construction plans. These <br /> original drawings shall become the proper ty of <br /> District. <br /> <br />13. It is understood and agreed thai when the described <br /> water system is constructed according to the plans, <br /> specifications, and standards of the Disfricl, said <br /> water system shell automat icel ly become tho <br /> property of the District without cost to the <br /> District, and without further agreement in <br /> coanecIioe therewith. <br /> <br />14. The Appl icenl, having conslrucjed the aforesaid <br /> water system at his own proper cost and expense <br /> end outside the District's standard policy for <br /> water exlensions, agrees to waive all claims for <br /> compensation or monies refundable for any capJ tel <br /> faci~ities constructed. <br /> <br />15. Indemnification of the District. The Applicant <br /> wil I indemnify, hold harmless sad keep harmless, <br /> Ihe District and its agents und employees from <br /> and against all claims, damages, losses and <br /> expenses - including ~t torney's fees ~ ar is/n9 out <br /> of or resulting from the performance of the work, <br /> provided that any such claim, damage, loss or <br /> expense is at tr ihutable to bodily injury, sickness, <br /> disease or death, or the Injury to or destruction <br /> of tangible property including the loss of use <br /> resulting therefrom, and is caused In whole or in <br /> part by any negligent or willful act or omission of <br /> the APPLICANT, LICENSED UTiLiTY CONTRACTOR, ANY <br /> SUBCONTRACTOR (Si thereof or anyone directly or <br /> 4 <br /> <br /> I <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.