My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG19880321
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
1988
>
AG19880321
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2003 9:14:23 AM
Creation date
11/27/2017 12:07:58 PM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
3/21/1988
Board
Board of Commissioners
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
172
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CABARRUS COUNTY <br /> <br />Estimate of Cost to Widen SR ]394, Poplar Tent Road, Prom SR ]429 to SR <br />From a 20~ Width to a 22~ Width. Length 0.80 Mile. Resurface with ]" <br />Wearing Surface. <br /> <br /> I-] 707 Tons $]7.00 = $ ]2,0]9.00 <br /> I-] Leveling 8 Tons 2].00 = J68~00 <br /> AC 5] Tons ~30.00 = 6,630.00 <br /> H B Base 265 Tons 20.00 = 5,300.00 <br /> <br /> $ 24,117.00 <br /> <br />Ineidentia] Stone at $16.00 Ton <br />(24) ($]6.00) $ 384.00 <br /> <br />Shoulder Const. Including Eros. Control at $500~00 Per 1,000 M'LF <br />(4.22) ($500.00) 2,~10.00 <br /> <br />Patchin~ with BCBC Type H at $80,00 Ton <br />(]6) ($80.00) ],280.00 <br /> <br />Te._~orary Pavement Marking Lines (4" White Paint) at $0.10 L. F. <br />(8,448) ($0.~0) 45.00 <br /> <br />Temporary Pavement Markin8 Lines (4" Yellow Paint) at $0.10 L. F. <br /> <br />(4,0]3) ($0.10) 401.00 <br /> <br /> $ 29,137.00 <br /> <br />SR ]394 <br /> <br /> I) $29,~37.00 Cont. 3500 $ 3],094.00 <br />Mobilization 2) 1,457.00 Const. 34]0 2,488.00 <br />Field Lab 3) 500.00 Design 3210 ]55.00 <br /> M & T 3240 3]}.00 <br /> <br /> $ 34,048.00 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.