My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG19880620
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
1988
>
AG19880620
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2003 9:14:15 AM
Creation date
11/27/2017 12:08:20 PM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
6/20/1988
Board
Board of Commissioners
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HDR Engineering, Inc. Law Proposal No. 267S8A June 13, 1988 <br /> <br /> Estimated Fee <br /> <br /> A budget allowance of $11,000 is recommended for the scope of services <br /> described above for the roadway, including our written engineering report. A <br /> budget sllowance o£ $4,000 is recommended for the scope o£ services described <br /> above for the embankment dam including our written engineering report. If <br /> subsurface conditions are encountered which would require ndditional drilling, <br /> sampling, testing or engineering for analysis that would nesult ill the fees for <br /> our services exceeding the figures indicated above, we would obtain your <br /> permission before proceeding. Our charges for the exploration will be computed <br /> from actual quantities of work performed and the appropriate unit prices shown <br /> on the attached Fee Schedule. <br /> <br /> Schedule <br /> <br /> Based on our present schedule, we can begin the field work within 5 to 8 <br /> days after we receive your authorization to proceed and should be~ completed <br /> within about 8 to 10 working days after commencing. The laboratory testing will <br /> require about 2 to 3'weeks to complete, The written reports will follow <br /> approximately 2 weeks after all of the field work and the proposed laboratory <br /> testing have been completed. As soon as the borings are completed, we will <br /> furnish you with preliminary verbal information by telephone. <br /> <br /> Authorization <br /> <br /> As our written authorization, please execute and return one copy of the <br />enclosed Proposal Acceptmnce Sheet. Any exceptions to this proposal or special <br />requirements not covered in the proposal should be listed on the Proposal <br />Acceptance Sheet. Please note that the General Conditions are a part of this <br />proposal. <br /> <br /> Law Engineering appreciates the opportunity to continue to offer our <br />professional geotechnical services on this project. If you have any questions <br />concerning this proposal, please contact us. <br /> <br /> Very truly yours. <br /> <br /> LAW ENGINEERING <br /> ~. Weekle~, P~.. <br /> Project Geotechnical Engineer <br /> <br /> lay ~, Sams, ~.~.~ <br /> Vice/~rosident <br /> Geotechnical Consultant <br />GLW/CES: krh <br /> <br />Attachments: Fee Schedule <br /> Proposal Acceptance Sheet - <br /> General Conditions <br /> <br /> iLAW ENGIN <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.