Laserfiche WebLink
-4- <br /> <br /> It is understood and agreed that the Applicant and other parties may <br /> discharge sewage into the proposed line or lines only under and in <br /> accordance with the sta~%dard rules and regulations of the County,or <br /> as such I'egulations may be amended, with reference to users of the <br /> County Sewerage System, particularly with reference to the payment <br /> of standard sewage service charges which are assessed by the County <br /> against users of its sewerage system, provided that any parties dis- <br /> charging sewage into the proposed line or lines and who do not obtain <br /> their water supply from the Cabarrus County Utility Department shall <br /> meter their water system with a metering device approved by the <br /> Cabarrus County Utility Department, for the purpose of determining <br /> sewer service charges; such sewage service charges shall be collected <br /> by and paid directly to the Cabarrus County Utility Department. <br /> <br /> 5. Any connections, additions, or extensiohs to the herein described <br /> sanitary sewer lines shall be made only upon written permission of <br /> the County. Such connections, additions, or extensions of the herein <br /> described sewer lines shall not be subject to any sanitary sewer <br /> connection privilege fees payable to this agreement. <br /> <br />6. The Applicant shall obtain all rights-of-way in widths satisfactory <br /> to the County Engineer where sewer lines are constructed across lands <br /> of the Applicant or others and being located in other than a public <br /> way. The Applicant or others and being located in other than a public <br /> way. The ~Dplicant shall show satisfactory evidence that he has <br /> obtained and recorded in the Cabarrus County Registry, proper agree- <br /> ments covering rights-of-way and that the same is free and clear of <br /> <br />7. The Applicant shall employ at his own proper cost and expense a <br /> Profesional Engineer registered in North Carolina whoshall design, <br /> lay out and supervise the construction'of these certain sanitary <br /> sewer lines, including any lift stations and force m~ins that Kay be <br /> required. Complete plans and profiles detaillng.all proposed donstruct- <br /> ion and equipment must be approved by the County~Engineer prior to <br /> beginning any construction. Said construction plans shall be prepared <br /> to County standard plan and profile. <br /> <br />8. The Applicant furthers agreesth~t upon approval of said Contractor <br /> and sanitary sewer plans, by the County Engineer, the owner of said <br /> properties requesting sanitary sewer shall guarantee the installation <br /> of the required sanitary sewerage system. Upon comple~on of the <br /> sewerage system as described, written notice thereof~shall be given <br /> by the Applicant to the County Engineer, who shall cause a final <br /> inspection of the sewerage system to be made and shall withi~ thirty <br /> (30) days accept the system for the County, provided .all stipulations <br /> of this contract have been met. <br /> <br /> <br />