My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG19881121
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
1988
>
AG19881121
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2003 9:14:19 AM
Creation date
11/27/2017 12:08:45 PM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
11/21/1988
Board
Board of Commissioners
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9. A~ter ~ompletio~ of all coh~tructiom, the Applicant ~hall furnish th¢~ <br /> origihal dra~ings of all construction plans, revised to show any and <br /> all revisions encountered during construction, to the · <br /> .... Cgbar~us County" ' <br /> Utility Oepartment marked "As-Built- The k~hal'pl~'ns shall show the <br /> actual.-condition i6 'which the fadility was physically constructed and <br /> /or installed. Further, .the final plans shall show the correct location <br /> of the facility as it r~lates to easements, right_o.f_way lines, proper~y <br /> lines, buildings, underground and/or overhead utility lines, roadways, <br /> railroads, and all ~ther phy'~ical features that Would have ~ny effect <br /> or influence upon the constructed facility. The Professional Engineer <br /> employe~ to design the facility shall be responsibie for the accuracy <br /> and completeness of the facility as shown on the final edition of the <br /> original construction plans... These original drawings shall become the <br /> property of the County. <br /> <br /> 10. It is further understood and agreed that~if any of'the above described <br /> sewer lines are s~rved by or connected in any manner to pressure lines <br /> of lift stations, the design of such pressure lines and lift stations <br /> shall be in accordance with the requirements of the Cabarrhs County <br /> Utility Department and shall be designed to cover any future expansion <br /> necessary to aCcomodate all anticipated fl0~s in the drainage area ~n <br /> which the lines a~e l~cated. <br /> <br /> 11. It is understood and agreed that when the described sewer system is <br /> constructed according to the plans, specifications, and standards of <br /> the Cabarrus Count~ Utility Department, said'sewer system shall <br /> automatically become the property of the County without cost to the <br /> County, and without further agreement in connection therewith. <br /> <br />12. The Applicant, having constructed the aforesaid sanitar~ sewer at %is <br /> own p£oper cost and expense and outside the County's standard policy <br /> for sewer extensions, agrees to waive all claims for compensation or <br /> monies refundable .fo~ any capital facilities constructed. <br /> <br />13. Indemnification of the County. The Contract6~'/Devaloper will indemnify, <br /> hold harmless and keep harmless, the County and.'its agents and ~mployees <br /> from and against all claims, damages, losses and ex ense <br /> att~rnev,s fees - --~-:- _ _ . P s - including <br /> the wor~, ~&~u~ug ouc or or resulting from the performance of <br /> provided that any such claim, damage, loss or expense is <br /> attributable to bodily injury, sickness, disease or death, or to injury <br /> to or destruction of tangible property including the loss of use <br /> resulting therefrom, and is caused in whole or in part by any negligent <br /> or willful .act or omission of the DEVELOPER, CONTRACTOR, ~nd <br /> SUBCONTRACTOR(S), or anyone directly or indirectly employed by any of <br /> them or anyohe for whose acts any of them may be liable. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.