Laserfiche WebLink
January 14, 1987 <br /> <br /> Board of County Con~issioners <br /> Cabarrus County <br /> Post Office Box 707 <br /> Concord, North Carolina 28025 <br /> <br /> Attention: Mr. Charles McGinnis <br /> County Manager <br /> <br /> Re: System Modifications in Low Pressure Areas <br /> <br /> Dear Mr. McGinnis: <br /> <br /> As requested, HDR Infrastructure, Inc. of North Carolina (HDR) hereby <br /> · /~ offers its services to perform the engineering design for the System <br /> ~ · Modifications in Low Pressure Areas, as described in our Preliminary <br />Engineering Report dated January 14, 1987. It is proposed that the <br />work be accomplished in accordance with our August 27, 1985, Agreement <br />for Miscellaneous Engineering Services. The scope of work follows: <br /> <br /> SCOPE OF WORK <br /> <br /> The work is divided into two projects as described below. <br /> <br /> Project A consists of improvements in Area I (Rock Hill Church Road <br /> vicinity) which includes a booster pump station, tying the existing <br /> 6-inch line on Montford Avenue {east) to the existing City of Concord <br /> line on the east side of US 29 Bypass, and extending additional 8-inch <br /> line along the northeast side of Rock Hill Church Road from Weddington <br /> Road to Sarah Drive. The proposed improvements will create a new <br /> service level in Area i which will provide all customers with adequate <br /> pressures during normal peak demands. <br /> <br /> Project B consists of improvements in Area 2 (Irish Potato Road <br /> vicinity) which includes a booster pump station near the intersection <br /> of NC 73 and Irish Potato Road, and a 6-inch line from the booster <br /> pump station parallel to NC 73 and tying into the existing 6-inch line <br /> on Kirkwood Drive. The proposed improvements will create a new <br /> service level in Area 2 which will provide all customers with adequate <br /> pressures during normal peak demands. <br /> <br /> <br />