Laserfiche WebLink
8. The Applicant agrees to construct the water tines, <br /> including any appurtenant structures and equipmenl, <br /> according to the Plans and Profiles as approved by <br /> the Director and in strict accordance with the <br /> current specifications and design criteria of the <br /> Water and Sewer District of Cabarrue County. The <br /> Applicant also agrees to furnish prior written <br /> notice to tho Oireclor es to the exact date <br /> construction wt Il begin, and tar ther agrees to <br /> furnish the Director every reasonable facility to <br /> ascertain whether or not the work as performed is <br /> in accordance with the specificalions. It is <br /> understood and agreed that Inspectors employed by <br /> Ihe District shell be stalioned at the work to <br /> report as to the progress and performance of the <br /> work, and shall be authorized to inspect any part <br /> of the work done and any material furnished, <br /> <br /> pipe or other appurtenance shall be placed except <br /> in Ihe presence of the Director or his authorized <br /> Inspectors without special permission of the <br /> Director. Such Inspectors, however, shall not <br /> relieve the Applicant from any obligation to <br /> perform atl of the work strictly in accordance with <br /> the Specilications. in case o! any disputes <br /> arising as to the materials furnished or the manner <br /> of performing the work, the Inspector shall have <br /> authority to reject materials or suspend work until <br /> the question at issue can be relurred lo and <br /> decided by the Director. It is further understood <br /> and agreed that the Applicant shall remov~ uny work <br /> or materials condemned as unsatisfactory by the <br /> Director and shall rebuild and replace same tu the <br /> standard required by the specifications, all at his <br /> own expense and in default thereof, the name may be <br /> done by the District and the cost charged against <br /> the Applicant. Final connection to the District's <br /> water system will not be permitted unlil all work <br /> has been approved by the Director. <br /> <br /> g. The Applicant or the applicant's contractor shall <br /> furnish to the Director written documentation tram <br /> a certified testing laboratory that all facililies <br /> installed nra free from ali becteri~ prior to <br /> putting any portion of the system in service. <br /> <br />lO. Upon the completion of the system es described, the <br /> Applicnnt shall request from the Director in <br /> writing a final inspection. Said inspection shell <br /> be scheduled by the Director within 30 days of the <br /> receipt of the request. <br /> <br /> 3 <br /> <br /> <br />