My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG19870817
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
1987
>
AG19870817
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2003 9:14:09 AM
Creation date
11/27/2017 12:09:53 PM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
8/17/1987
Board
Board of Commissioners
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br /> <br /> SCOPE OF SERVICES <br /> <br /> ESTIMATED PROJECT SCHEDULE <br /> <br /> CODDLE CREEK RESERVOIR <br /> <br /> CABARRUS COUNTYt N. C. <br /> <br /> AUGUST 1987 <br /> <br /> DATE <br /> ACTIVITY / TASK START FINISH <br /> <br />B. NC 75 HIGHWAY RELOCATION / NC 15~ BRIDGE RELOCATION <br /> Preliminary Surveys 11-15-87 12-15-87 <br /> Location Surveys 1-01-88 2-01--88 <br /> Hydrographic Design 11-15-87 1-01--88 <br /> Bridge Survey ~eport 12-01-87 1-01-88 <br /> Alignment and Grade Design 12-15-87 2-15-88 <br /> Preliminary ROW Plans 12-15-87 2-15-88 <br /> ROW Plans 2-15-88 5-15-88 <br /> Final Roadway Construction Plans 5-01-88 4-01-88 <br /> Geotechnical Investigations 2-15-88 5-15-88 <br /> Preliminary Bridge Plans 12-15-87 2-15-88 <br /> Final Bridge Plans 5-01-88 4-01-88 <br /> <br /> CONSTRUCTION PLANS - DAM AND RESERVOIR <br /> Cover Sheet 8-15-87 ~-01-87 <br /> Table of Quantities 10-15-87 12-15-87 <br /> Drainage Area Map 8-15-87 9-15-87 <br /> Reservoir Area and Ownership 10-15-87 11-15-87 <br /> Dam Site Plan 8-15-87 9-15-87 <br /> Dam and Emergency Spillway Profiles 10-01-87 11-15-87 <br /> Geologic Investigations Plan 8-15-87 9-15-87 <br /> Boring Logs 10-15-87 11-15-87 <br /> Boring Logs for BorPow Area 10-15-87 !1-15-87 <br /> Fill Placement Details 10-15-87 12-15-87 <br /> Riprap Details 11-15-87 12-01-87 <br /> Principal Spill~a¥ 10-15-87 11-15-87 <br /> Spillway Gate 10-15-87 12-15-87 <br /> Drawdown Pipe 10-15-87 12-15-87 <br /> Emergency Spillway Details 11-15-87 12-15-87 <br /> Valve Assembly for Drawdown Pipe 10-15-87 12-15-87 <br /> Fence and Seeding Plan 11-15-87 12-01-~7 <br /> Fence Details 11-15-87 12-01-87 <br /> Borrow Sections 10-15-87 12-01-87 <br /> Raw Water Pump Station/Intake Structure 9-15-87 12-15-87 <br /> Site Piping 10-15-87 12-01-87 <br /> Demolition Plan-Existing Raw Water Pump Station 11-01-87 12-01-87 <br /> Fieldcrest Cannon RaH Water Pump Station <br /> Relocation 9-15-87 1-01-88 <br /> <br /> PAGE 3 ~ 15-Au,~-87 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.