My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG19870908
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
1987
>
AG19870908
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2003 9:14:09 AM
Creation date
11/27/2017 12:09:55 PM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
9/8/1987
Board
Board of Commissioners
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br /> <br /> SCOPE OF SERVICES <br /> <br /> ESTIMATED PRD~ECT SCHEDULE <br /> <br /> CODDLE CREEK RESERVOIR <br /> <br /> CABARRUG COUNTY, N. C. <br /> <br /> AUGUST 1987 <br /> <br /> DATE <br /> ACTIVITY / TASK START FINISH <br /> <br />PHASE I - PREDESIGN <br /> <br />A. PRELIMINARY REPORT - DAM SAFETY <br /> Description of Properties Below Dam 7-15-87 8-28-87 <br /> Maps 7-15-87 8-28-87 <br /> Preliminary Design Criteria 7-15-87 8-28-87 <br /> Meeting with NODNRCD 9-09-87 <br /> <br />B. FINAL REPORT - DAM SAFETY <br /> Seotechnical Report Supplement 8-15-87 10-15-87 <br /> Stability Analysis 10-15-87 11-15-87 <br /> Hydrology - incl. Breach Analysie 8-15-87 10-15-87 <br /> Seepage Analysis 9-15-87 11-i5-87 <br /> Erosion Protection 10-15-87 11-15-87 <br /> Other Design Data 10-15-87 11-15-87 <br /> Construction Schedule .10-15-87 11-15-87 <br /> Reservoir Filling Schedule i1-15-87 12-15-87 <br /> Operation and Maintenance Plan 11-15-87 12-15-87 <br /> Sedimentatien 11-15-87 12-15-87 <br /> Minimum Stream Flow Provisions 10-15-87 11-15-87 <br /> <br />0. EN8INEEERIN8 REPORT - WATER SUPPLY <br /> Description of Project 7-15-87 8-15-87 <br /> Present / Future Demands 7-15-87 8-15-87 <br /> Description of Present Supply 7-15-87 8-15-87 <br /> Population (Current and Trends) 7-15-87 8-15-87 <br /> Present / Future Yield o~ Supply 7-15-87 8-15-87 <br /> Character/Quality of Proposed Supply <br /> - Hydrological Data 8-01-87 8-21-87 <br /> - Stream Flo~ Rates 8-01-87 8-21-87 <br /> - Ohemical, Mineral, Bacteriological and <br /> Physical Analysis of Proposed Source 8-01-87 8-21-87 <br /> - Location ~f Potential Sources of Pollution 8-01-87 8-21-87 <br /> Proposed Treatment Process <br /> - Criteria and Basis o~ Design of Units 8-21-87 9-15-87 <br /> - Methods sf Arriving at Solutions 8-21-G7 9-15-87 <br /> - Modi+ications to ExiSting Treatment <br /> Facilities (If Required) 8-21-87 9-15-87 <br /> Estimated Project Costs 9-01-87 9-15-87 <br /> <br />PAGE i L~~ I 51-Aug-87 <br /> I <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.