Laserfiche WebLink
m <br /> <br /> CABARRUS COUNTY <br /> <br /> PROPOSED SEWER FACILITIES <br /> <br /> CONSTRUCTION COST ESTIMATE <br /> <br /> FOR <br /> <br /> FISHERTOWN AREA <br /> <br /> (IRISH BUFFALO CREEK BASIN) <br /> <br /> NOVEMBER 21, 1~8~ <br /> <br /> ITEM QUANTITY UNITS UNIT TOTAL <br /> PRICE COST <br /> <br />12" SEWER 0 LF 52,00 ~0 <br />8" SEWER 2&~500 LF 27.00 715,500 <br />4' DIA MANHOLES 88 EA 1,500.00 114,400 <br />24" SCP (BORED) 0 LF 80.00 0 <br />16" SCP (BORED) 1200 LF 60.00 72,000 <br />PUMP STATION (TYPE A) ~ EA 25~000.00 75,000 <br />6" FORCE MAIN 2000 LF 10.00 20,000 <br /> <br /> SUBTOTA~ $996,900 <br /> CONTINGENCIES 149,100 <br /> <br /> CONSTRUCTION COST $I~146,000 <br /> <br /> ENGINEESING, LEGAL ~ <br /> ADMINISTRATIVE 172,000 <br /> LAND 15,000 <br /> <br /> PROJECT COST $1,355,000 <br /> <br /> <br />