My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG19860407
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
1986
>
AG19860407
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2003 9:14:03 AM
Creation date
11/27/2017 12:10:32 PM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
4/7/1986
Board
Board of Commissioners
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-5- <br /> <br />9. After completion of all construction, the Applicant shall furnish the <br /> original drawings of all construction plans, revised to show any and <br /> all revisions encountered during construction, to the Cabazrus County <br /> Utility Department marked "As-Built". The final plans shall show the <br /> actual conditios in which the facility was physically constructed and <br /> /or installed. Further, the final plans shall show the correct location <br /> of the facility as it relates to easements, right-of-way lines, property <br /> lines, buildings, underground and/or overhead utility lines, roadways, <br /> railroads, and all other physical features that would have any effect <br /> or influence upon the constructed facility. The Professional Engineer <br /> employed to design the facility shall be responsible for the accuracy <br /> and completeness of the facility as sho~ on the final edition of the <br /> original construction plans. These original drawings shall become the <br /> property of the County. <br /> <br />10. It is further understoo~ and agreed that if any of the above described <br /> sewer lines are served by or connected in any manner to pressure lines <br /> of lift stations, the design of such pressure lines and lift stations <br /> shall be in accordance with the requirements of the Cabarrus County <br /> Utility Department and shall be designed to cover any future expansion <br /> necessary to accomo~ate all anticipated flows in the drainage'area in <br /> which the-lihes'~re'l~cated~ <br /> <br />11. Ir'is underst6o~ And'agreed .that when the ae~cri~ed s~w6r system.i~'- ~: <br /> constructed ~ccording-t0'-the plans, 'speeifi=ati6ns;'and standards'of ' <br /> the Cabarrus Coanty Utility Department, said seQ~r system shall ' '' <br /> automatically become the property of the County without cost to the <br /> County, and without further agreement in connection therewith. <br /> <br />12. The Applicant, having constructed the aforesaid sanitary sewer at his <br /> own proper cost and expense and outside the County's standard policy <br /> for sewer extensions, agrees to waive all claim~ for compensation or <br /> monies refundable for any capital facilities constructed. <br /> <br />13. Indemnification of the County. The Contractor/Developer will indemnify, <br /> hold harmless and keep harmless, the County and its agents and employees <br /> from and against all claims, damages, losses and expenses - including <br /> attorney's fees - arising out of or resulting fro~ the performance of <br /> the work, provided that any such claim, damage, loss or expense is <br /> attributable to bodily injury, sickness, disease or death, or to injury <br /> to or destruction of tangible property including the loss of use <br /> resulting therefrom, and is caused in whole or in part by any negligent <br /> or willful act or o~ission of the D~VELOPER, CONTRACTOR, and <br /> SUBCONTRACTOR(S), or anyone directly or indirectly employed by any of <br /> them or anyone for whose acts any of them may be liable. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.