My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG19860505
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
1986
>
AG19860505
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2003 9:14:03 AM
Creation date
11/27/2017 12:10:37 PM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
5/5/1986
Board
Board of Commissioners
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> <br /> CA~ARRUS COUNTY '' <br /> HECHARICAL PERHIT AND INSPECTION FEES <br /> EFFECTIVE JULY 1, 1985 <br /> <br />AIR-CONDITIONING UNITS' <br />1HP through 5 HP ......................................... $15.00 <br /> <br />Each additional 5 HP or fraction thereof constitutes an additional <br />unit. <br /> <br />HEATING UNITS <br />0 through 150,000 BTU ..................................... 15.00 <br /> <br />Each additional 150,000 BTU or fraction thereof constitutes an <br />additional unit. <br /> <br />RESIDENTIAL <br /> <br />Each additional A/C unit after the first unit ............. 12.50 <br />Each additional Heating unit after the first unit ......... 12.50 <br />Gas Piping ................................................. 10.00 <br />Boilers {150,000) ......................................... 15.00 <br />Thru-Vail Ht8. & Cooling .................................. 10.00 <br />Floor Furnace ............................................ 10.00 <br />Vail Furnace .............................................. 10.00 <br />Unit Heater (150,000) ..................................... lO.O0 <br />Electric Unit Heaters ..................................... 5.00 <br />Co~auercial Exhaust Hoods .................................. 25.00 <br />Commercial Dryers ......................................... 15.O0 <br /> <br /> ......... 10.00 <br />Replace-Heating (150,000, 5-T) (No Duct Change) ......... 10.00 <br /> Cooling <br /> <br />Fan Coil (Heating and/or Coolin§) ......................... 10.00 <br />Conversion Burner (150,000) ............................... 10.00 <br /> <br />THERE WILL BE A TEN ($10.00) RE-INSPECTION CHARGE FOR ART RETUR~ <br />TRIP TO A JOB SITE IF THE CONTRACTOR, SUB-CONT~ICTOR OR Ok~ER 1S <br />AT FAULT FOR THE RE-IESPECTION. <br /> <br />THIS SCHEDULE VAS APPROVED DURING THE COUNTY CO}~ll$S1ONERS REGULAR <br />)~Y 6, 1985 flEETING. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.