My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG19860616
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
1986
>
AG19860616
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2003 9:14:03 AM
Creation date
11/27/2017 12:10:46 PM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
6/16/1986
Board
Board of Commissioners
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Charles McGinnis, County Manager <br />March 4, 1986 <br />Page Two <br /> <br />SCOPE OF WORK <br /> <br /> 1. Description of Study Area: <br /> <br /> A. Upper Rocky River/Coddle Creek Drainage Basin: This basin <br /> includes the area beginning at the intersection of Rocky River <br /> and Flowes Store Road and bounded on the east by the Irish <br /> Buffalo Creek drainage basin, on the north by the Cabarrus/Rowan/ <br /> Iredell County line, on the west by the Cabarrus/Mecklenburg <br /> County line, on the south by the Mallard Creek/Rocky River <br /> drainage basin to the point of confluence with Coddle Creek and <br /> the area north of Rocky River from Coddle Creek to the point of <br /> beginning. <br /> <br /> B. Muddy Creek/Rocky River Drainage Basin: Beginning at the <br /> southern tip of Cabarrus County, in a northerly direction along <br /> Rocky River to the gas pipeline right-of-way, then northwest <br /> along the gas pipeline right-of-way to U.S. Highway 601, then <br /> north along U.S. 601 to N.C. 24/27, then west along N.C. 24/2/ to <br /> Old Camden Road, then south along Old Camden Road to the - <br /> Mecklenburg County line.then along the Cabarrus/Mecklenburg <br /> County line to the point of beginning. <br /> <br /> 2. Population/Land Use: <br /> <br /> A review of the population, land development and use trends and zoning <br /> in the areas described. Population data, projections, and land use <br /> and zoning information utilized will be provided by the County <br /> Planning staff. <br /> <br /> 3. Study Period: <br /> <br /> The study will cover a twenty year period from present to the year <br /> 2005. <br /> <br /> 4. Water Demands: <br /> <br /> A review and analysis of existing water consumption records, where <br /> available, to be used in conjunction with the population projections <br /> to determine the present and future wastewater flows. Also, review <br /> existing 201 Facilities Plan and other recent sewer studies that may <br /> be available. <br /> <br /> 5. System Layout: <br /> <br /> A schematic layout of the proposed wastewater systems including line <br /> sizes, and approximate location of collection sewers, interceptors, <br /> pumping stations, force mains and wastewater treatment plants. Layout <br /> maps will be based on information available from existing USGS <br /> topographic maps. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.