My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG19861103
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
1986
>
AG19861103
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2003 9:14:04 AM
Creation date
11/27/2017 12:11:06 PM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
11/3/1986
Board
Board of Commissioners
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-5- <br /> <br />9. After c6mpletion of all construction, the ;~pllcant shall furnish the <br /> Original drawings of all. construction plans, revised to show any and <br /> all revisions encountered during construction, to the Cabarrus County <br /> Utility Department marked "~-Bullt". The final plans shall show the <br /> actual condition in which the facility was physically constructed and <br /> /or installed. Further, the final plans shall show the correct location <br /> of the facility as it relatss to easements, right-of-way lines, property <br /> lines, buildings, u~dergrounda~d/or overhead utility lines, roadways, <br /> railroads, and all other physical features that would have any effect <br /> or influence upon the constructed facility. The Professional Engineer <br /> employed to design the facility shall be responsible for the accuracy <br /> a~d completeness of the facility as shown on the final edition of the <br /> original construction plans. These original drawings shall become the <br /> property of the County. <br /> <br />10. It is further understoo~ and agreed that if any of the above described <br /> sewer lines are served by or connected in any manner to pressure lines <br /> of lift stations, the design of such pressure lines and lift stations <br /> shall be in.accordance with the'requirements~of th~=Cabafrus County ' <br /> Utility Department and.shall~be desi~ned2to: cover: an~:~uture:e~pansion~ <br /> necessary-to accom~ate'a~l~ntici~ated-fi~ws ~n--%he'd~ainage area in <br /> which the lines are l~cated. - .... <br /> <br /> 11. It is understood:and agreed that when~the described sewer system is <br /> constructed according to t~e-plan~, specifications,-ai~d standards of <br /> the Cabarrus Count~ Utility Department,-said sewer system shall <br /> aut~tically becom~ the property of the Cou~t~ with6ut cost to.the <br /> County, andwitho~t fu~thek agreement in connection therewith. <br /> <br /> 12. The Applicant, having constructed the aforesaid sanitary sewer at his <br /> own proper cost and expense and uutside the County's standard policy <br /> for sewer extensions, agrees to waive all clai~ for compensation o~ <br /> monies refundable for any capital facilities constructed. <br /> <br /> 13. Indemnification of the County. The Contractor/Developer will indemnify, <br /> hold harmless and keep harmless, the County and its agents and employees <br /> from and against all claims, damages, losses and expenses - including <br /> attorney's fees - arising out of or resulting from the.performance of <br /> the work, provided that any such claim, damage, loss or expense is <br /> attributable to bodily injury, sicknesS, disease oF death, Or to injury <br /> to or destruction of tangible property including the loss of use <br /> resulting therefrom, and is caused in whole or in part by any negligent <br /> or willful act or omission of the DE~ELOPER, CONT~ACTOR, and <br /> SUBCONTRACTOR(S), or anyone directly or indirectly employed by any of <br /> them or anyone for whose acts any Of them may be liable. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.