Laserfiche WebLink
NOW, ..~.E~FORE, in consideration of the premises con':dined hare/n, the <br />parties hereby agree as fol'lows: <br /> <br />1. The Applicant is hereby granted ~ermission to connect only those certain <br /> sanitary sewer lines as hereinbefore described, at the certain location or <br /> locations as previously ~escribed herein. The permission so gr~nted shall <br /> not be construed as granting permission for any additions or extensions <br /> desired to be constructed by the Applicant or others; such additions or <br /> extensions shall require a separate and new agreement between the County <br /> and the parties desiring to make such additions or extensions. <br /> <br />2. All construction pertaining to sanitary sewerage shall be performed by a <br /> licensed Utility Contractor. The Applicant agrees to furnish the Cabarrus <br /> County Utility Department with the name and license number as listed with <br /> the North Carolina Licensing Board, of %he Contractor whm has be,n retained <br /> to construct %he before-described sewerage system. <br /> <br />3. The Applicant agrees to construct the sanitary sewer lines, including any <br /> appurtenant structures and equipment, according to the Plans and Profiles <br /> as approved by the Count~ Engineer and in strict accordance with the cur- <br /> rent specifications and design criteria of the Cabarrus County Utility <br /> Department. The applicant also agrees to furnish prior written notice to <br /> the County Engineer as to the exact date construction will begin, and <br /> further agrees to furnish the County Engineer every reasonable facility <br /> to ascertain whether or not the wo£k as perfo~ned is in accordance with <br /> the specifications. It is understood and agreed that Inspectors employed <br /> by the County shall be stationed at the work to report as to the progress <br /> and performance of the work, and shall be authorized to inspect any part <br /> of the work done and any material furnished, including its preparation or <br /> manufacture. No sewer pipe or other appurtenance shall be placed except <br /> in the presence of the County Engineer or his authorized Inspectors without <br /> special permission of the Utility Director. Such Inspectors, however, <br /> shall not relieve the Applicant from any obligation to perform all of the <br /> work strictly in accord~ce with the Specifications. In case of any <br /> disputes arising as to the materials furnished or the manner of performing <br /> the work, the County Engineer shall have authority to reject materials or <br /> suspend work until the question at issue can be referred to and decided by <br /> %he Utility Director. It is further understoo~ and agreed that the Appli- <br /> cant shall remove any work or materials condemned as unsatisfactory by the <br /> CouBty Engineer and shall rebuild and replace same to the standard required <br /> by the specifications, all at his own expense and in default thereof, the <br /> same may be done by the County and the cost charged against the Applicant. <br /> Final connection to the County's sanitary sewerage system will not be per- <br /> mitted untll all work has been approved by the County Engineer. <br /> <br /> <br />