My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG19861117
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
1986
>
AG19861117
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2003 9:14:07 AM
Creation date
11/27/2017 12:11:10 PM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
11/17/1986
Board
Board of Commissioners
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CABARRUS COUNTY <br /> <br /> PROPOSED SEWER FACILITIES <br /> <br /> CONSTRUCTION COST ESTIMATE <br /> <br /> FOR <br /> <br /> MUDDY CREEK INTERCEPTOR AND TREATMENT PLANT <br /> <br /> (MIDLAND AREA) <br /> <br /> NOVEMBER 15, <br /> <br /> ITEM QUANTITY UNITS UNIT TOTAL <br /> PRICE COST <br /> <br />PART A - INTERCEPTOR: <br /> <br />15" SEWER 20,&O0 LF $35.00 $721,000 <br />12" SEWER &,SOO LF 52.00 217~&00 <br />8" SEWER 52,400 LF 27.00 1,414,800 <br />4' DIA MANHOLES 2&& EA 1~500.00 545,800 <br />RAILROAD CROSSING 2 LS 50,000.00 &O,O00 <br />50" SOP (BORED) 150 LF 140.00 21,000 <br />24" SOP (BORED) 80 LF 80.00 <br />SEEDING 58 AB 1,&O0.O0 60,800 <br />PUMP STATION I LS 40,000.00 40,000 <br />&" FORCE MAIN 1,800 LF 10.00 18,000 <br /> <br /> SUBTOTAL A $2~05,400 <br />PART B - TREATMENT PLANT: <br /> <br />INFLUENT PUMP STATION I LS $60,000.00 $&O,O00 <br />SRADINS I LS 100,000.00 100,000 <br />AERATION EQUIPMENT I LS 50,000.00 50~000 <br />CONCRETE PADS I LS 25,000.00 25,000 <br />SEEDINS 1 LS 7,000.00 7,000 <br />EROSION CONTROL I LS 5,000.00 5,000 <br />CHLORINATION I LS &O,O00.O0 &O,O00 <br />LAB/CONTROL BLDS I LS 70~000.00 70,000 <br />GRIT REMOVAL & SCREENING I LS 50,000.00 50,000 <br />SITE PIPING I LS 80~000.00 80,000 <br /> <br /> SUBTOTAL B $507,000 <br /> <br /> SUBTOTAL A&B ~,~12,400 <br /> CONTINGENCIES 511~&00 <br /> <br /> CONSTRUCTION COST <br /> <br /> ENGINEERING, LEGAL & <br /> ADMINISTRATIVE 588,000 <br /> LAND 1&2,000 <br /> <br /> PRO~ECT COST $~,&74,000 <br /> <br />PASE I FILENAME:CSS5 15-Nov-B& <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.