Laserfiche WebLink
CABARRUS COUNTY <br /> <br /> PROPOSED SEWER FACILITIES <br /> <br /> CONSTRUCTION COST ESTIMATE <br /> <br /> FOR <br /> <br /> CODDLE CREEK INTERCEPTOR <br /> <br /> [US HIGHWAY 29 TO 1-85) <br /> <br /> NOVEMBER 15, <br /> <br /> ITEM QUANTITY UNITS UNIT TOTAL <br /> PRICE COST <br /> <br />24" SEWER 16,500 LF $55.00 $863,900 <br />15" SEWER 4,500 LF 35.00 $157,500 <br />12" SEWER 8,000 LF 52.00 $256e000 <br />B" SEWER 57,500 LF 27.00 1,552,500 <br />4' DIA MANHOLES 288 EA 1,300.00 574,400 <br />42" SCP (BORED OR TUNNELED) 500 LF 240.00 72,000 <br />24" SCP (BORED) 800 : LF BO.O0 64,000 <br />16" SCP [BORED) 1200 'LF 60.00 72,000 <br />PUMP STATION ' I EA 25,000.00 25,000 <br />PUMP STATION 2 EA 50,000.00 100~000 <br />6" FORCE MAIN 2200 LF ..- 10.00 22,000 <br />SEEDING 40 AC 1,600.00 - ~4~000 <br /> <br /> SUBTOTAL $5~625~500 <br /> CONTINGENCIES 545,700 <br /> <br /> CONSTRUCTION COST $4,167,000 <br /> <br /> ENGINEERING, LEGAL & <br /> ADMINISTRATIVE 625,000 <br /> LAND <br /> <br /> {~RO3E~T COST $4,~52,000 <br /> <br />PAGE I FILENAME~CSS2 13-Nov-B6 <br /> 5 <br /> <br /> <br />