Laserfiche WebLink
CABARRUS COUNTY <br /> <br /> PROPOSED SEWER FACILITIES <br /> <br /> CONSTRUCTION COST ESTIMATE <br /> <br /> FOR <br /> <br /> ROCKY RIVER INTERCEPTOR <br /> <br /> (US HIGHWAY 29 TO POPLAR TENT ROAD) <br /> <br /> NOVEMBER 15, l~Bb <br /> <br /> ITEM QUANTITY UNITS UNIT TOTAL <br /> PRICE COST <br /> <br /> 24" SEWER 50v200 LF $55.00 $1v&OOv&O0 <br /> 12" SEWER 3,500 LF 52.00 112,000 <br /> 8" SEWER 25~100 LF 27.00 &77vTO0 <br /> 4' DIA MANHOLES 19& EA 1~500.00 254~800 <br /> 42" SCP (BORED OR TUNNELED) 800 LF 240.00 192,000 <br /> 24" SCP (BORED) 100 LF SO. O0 8,000 <br /> 16" SOP CBDRED) 1000 LF &O.O0 &O~O00 <br /> SEEDING 46 AC 1,600.00 75,600 <br /> <br /> SUBTOTAL $2~97S,700 <br /> CONTINGENCIES 44b,500 <br /> <br /> CONSTRUCTION COST $5,425,000 <br /> <br /> ENGINEERING, LEGAL & <br /> ADMINISTRATIVE 515,000 <br /> LAND 184,000 <br /> <br />. PROOECT COST $4,122,000 <br /> <br /> PAGE I FILENRME:CGS4 I~-Nov-B& <br /> <br /> <br />