Laserfiche WebLink
CABARRUS COUNTY <br /> <br /> PROPOSED SEWER FACILITIES <br /> <br /> CONSTRUCTION COST ESTIMATE <br /> <br /> FOR <br /> <br /> CODDLE CREEK INTERCEPTOR <br /> (WOLF MEADOW BRANCH TO US HIGHWAY <br /> NOVEMBER 21, 19Bb <br /> <br />-- ITEM QUANTITY UNITS UNIT TOTAL <br /> PRICE COST <br /> <br /> 50" SEWER 17,100 LF Sb&.O0 <br /> 12" SEWER 0 LF 52.00 0 <br /> 8" SEWER 28,000 LF 27.00 75~,000 <br /> 5' DIA MANHOLES 57 EA 2,000.00 114,000 <br /> 4' DIA MANHOLES 95 EA 1,500.00 120,900 <br /> 48" SCP {BORED DR TUNNELED) 500 LF 500.00 90,000 <br /> 24" SCP (BORED) 0 LF SO. O0 0 <br /> l&" SOP (BORED) 800 LF bO.O0 48~000 <br /> SEEDING 24 AC 1,bO0. O0 <br /> <br /> SUBTOTAL $2,2~5~00 <br /> CONTINGENCIES 544,100 <br /> <br /> CONSTRUCTION COST $2,~40,000 <br /> <br /> ENGINEERING~ LEGAL & <br /> ADMINISTRATIVE 5~&~O00 <br /> LAND ~000 <br /> <br /> PRO~ECT COST <br /> <br /> HDR INFRASTRUCTURE INC. FILENAME:CSSJA 21-Nov-Bb <br /> <br /> <br />