Laserfiche WebLink
CABARRUS COUNTY <br /> <br /> PROPOSED SEWER FACILITIES <br /> <br /> CONSTRUCTION COST ESTIMATE <br /> <br /> FOR <br /> <br /> CODDLE CREEK INTERCEPTOR <br /> <br /> (US HIGHWAY 29 TO WEDDINSTON RD) <br /> <br /> NOVEMBER 21, 198& <br /> <br />· ITEM QUANTITY UNITS UNIT TOTAL <br /> PRICE COST <br /> <br /> 24" SEWER 10,500 LF $55.00 <br /> 15" SEWER 0 LF 55.00 <br /> 12" SEWER 5,000 LF 52.00 $~&,O00 <br /> 8" SEWER 40,000 LF 27.00 1,080,000 <br /> 4' DIA MANHOLES 178 EA 1,500.00 251,400 <br /> 42" SCP (BORED OR TUNNELED) 500 LF 240.00 72,000 <br /> 24" SCP (BORED) 600 LF 80.00 4B,O00 <br /> l&" SCP (BORED) 1200 LF 60.00 72,000 <br /> PUMP STATION (TYPE A) I EA 25,000.00 25,000 <br /> &" FORCE MAIN 700 LF 10.00 7,000 <br /> SEEDING 19 AC 1,~00.00 50,400 <br /> <br /> SUBTOTAL $2,218,500 <br /> CONTINGENCIES 332v700 <br /> <br /> CONSTRUCTION COST $2,551,000 <br /> <br /> ENGINEERINSv LEGAL & <br /> ADMINISTRATIVE 3BSvO00 <br /> LAND 76,000 <br /> <br /> PROJECT COST $5,010,000 <br /> <br /> HOR INF~AST~UCTURE I~C.. .... FILENAME:CSS2A 21-Nov-S6 <br /> <br /> <br />