Laserfiche WebLink
CABARRUS COUNTY <br /> <br /> PROPOSED SEWER FACILITIES <br /> <br /> CONSTRUCTION COST ESTIMATE <br /> <br /> FOR <br /> <br /> ROCKY RIVER INTERCEPTOR <br /> <br /> (ROBERTA RD TO US 29) <br /> <br /> NOVEMBER 21, <br /> <br /> ITEM QUANTITY UNITS UNIT TOTAL <br /> -' PRICE COST <br /> <br /> 30" SEWER 20,000 LF $&&.O0 $1,520,000 <br /> 24" SEWER 0 LF 55.00 0 <br /> 8" SEWER 5,000 LF 27.00 81,000 <br /> 5' DIA MANHOLES ~7 EA 2,000.00 154,000 <br /> 4' DIA MANHOLES 10 EA 1,500.00 1~,000 <br /> 48" SCP (BORED OR TUNNELED) 200 LF 500.00 60,000 <br /> 24" SCP (BORED) 0 LF 80.00 0 <br /> l&" SOP (BORED) 150 LF &O.O0 <br /> SEEDING 28 AC 1,&O0.O0 44,800 <br /> <br /> SUBTOTAL $1,&&l~SO0 <br /> CONTINGENCIES <br /> <br /> CONSTRUCTION COST $1,~11,000 <br /> <br /> ENGINEERING, LEGAL <br />..-' ADMINISTRATIVE 287,000 <br /> LAND 112~000 <br /> <br /> PROJECT COST $2~10~000 <br /> <br /> HDR INFRASTRUCTURE INC. FILENAME:CSSSC 21-Nov-8~ <br /> <br /> <br />