Laserfiche WebLink
CABARRUS COUNTY <br /> <br /> PROPOSED SEWER FACILITIES <br /> <br /> CONSTRUCTION COST ESTIMATE <br /> <br /> FOR <br /> <br /> ROCKY RIVER INTERCEPTOR <br /> <br /> (I-B5 TO POPLAR TENT ROAD) <br /> <br /> NOVEMBER 21~ 1986 <br /> <br /> ITEM QUANTITY UNITS UNIT TOTAL <br /> PRICE COST <br /> <br /> 24" SEWER 12,200 LF $55.00 <br /> 12" SEWER 5~500 LF 52.00 112e000 <br /> G" SEWER 25,100 LF 27.00 <br /> 4' DIA MANHOLES 156 EA 1~500.00 17&~800 <br /> 42" SCP (BORED OR TUNNELED) 200 LF 240.00 48,000 <br /> 24" SCP (BORED) 100 LF 80.00 8~000 <br /> 16" SCP (BORED) 1000 LF 60.00 60,000 <br /> SEEDING 22 AC 1~600.00 55,200 <br /> <br /> SUBTOTAL $1,764,500 <br /> CONTINGENCIES 264~700 <br /> <br /> CONSTRUCTION COST $2vO2~vO00 <br /> <br /> ENOINEERING~ LEGAL & <br /> ADMINISTRATIVE 504~000 <br />'=' LAND BB~O00 <br /> <br /> PRO3ECT COST $2,421,000 <br /> <br /> HDR INFRASTRUCTURE INC. FILENAME:CSS4B 21-Nov-B6 <br /> <br /> <br />