Laserfiche WebLink
CABARRUS COUNTY <br /> <br /> PROPOSED SEWER FACILITIES <br /> <br /> CONSTRUCTION COST ESTIMATE <br /> <br /> FOR <br /> <br /> MUDDY CREEK INTERCEPTOR AND TREATMENT PLANT <br /> <br /> (MIDLAND AREA) <br /> <br /> NOVEMBER 21, 198b <br /> <br /> ITEM QUANTITY UNITS UNIT TOTAL <br /> PRICE COST <br /> <br /> PART A - INTERCEPTOR: <br /> <br /> 15" SEWER 10~500 LF $55.00 $567~500 <br /> 12" SEWER &,800 LF 52.00 217,600 <br /> 8" SEWER 52,400 LF 27.00 1,414,800 <br /> 4' DIA MANHOLES 252 EA 1,500.00 501,600 <br /> RAILROAD CROSSING 2 LS 50,000.00 &O,O00 <br /> 50" SOP (BORED) 150 LF 140.00 21,000 <br /> 24" SCF (BORED) BO LF 80.00 &,~O0 <br /> SEEDING 24 AC l,&O0.O0 58,400 <br /> PUMP STATION I LS 40,000.00 40,000 <br /> 6" FORCE MAIN 1,BO0 LF 10.00 18,000 <br /> <br /> SUBTOTAL A $2,485~500 <br /> PART B - TREATMENT PLANT: <br /> <br /> INFLUENT PUMP STATION I LS $60,000.00 <br /> GRADING I LS 100,000.00 100,000 <br /> AERATION EQUIPMENT I LS 50~000.00 50,000 <br /> CONCRETE PADS I LS 25,000.00 25,000 <br /> SEEDING I LS 7~000.00 7,000 <br /> EROSION CONTROL I LS S,O00.O0 5,000 <br /> CHLORINATION I LS 60,000.00 60,000 <br /> LAB/CONTROL SLDG I LS 70,000.00 70,000 <br /> SRIT REMOVAL & SCREENINS I LS SO,O00.O0 <br /> SITE PIPING I ES 80,000.00 <br /> <br /> SUBTOTAL B $507,000 <br /> <br /> SUBTOTAL A&B <br /> CONTINGENCIES 448,?00 <br /> <br /> CONSTRUCTION COST $3,441,000 <br /> <br /> ENGINEERING~ LEGAL & <br /> ADMINISTRATIVE 516,000 <br /> LAND 1OhiO00 <br /> <br /> PRO~ECT COST $4~0b5,000 <br /> <br />· HDR INFR~S~RU~TUR~_INCz FILENAME, CSS5A 21-Nov-86 <br /> <br /> <br />